红石岩堰塞湖应急处置的关键技术
引用本文:王琳,李守义,于沭,杜效鹄,邓刚.红石岩堰塞湖应急处置的关键技术[J].中国水利水电科学研究院学报,2015(4):284-289.
作者姓名:王琳  李守义  于沭  杜效鹄  邓刚
作者单位:西安理工大学水利水电学院, 陕西西安710048;西安理工大学水利水电学院, 陕西西安710048;中国水利水电科学研究院岩土工程研究所, 北京100048;水电水利规划设计总院, 北京100120;中国水利水电科学研究院岩土工程研究所, 北京100048
基金项目:国家重点基础研究发展计划(973计划)(2013CB036400)
摘    要:云南鲁甸"8·03"地震导致牛栏江红石岩水电站下游600 m处山体滑坡堵江,形成最大库容达2.6亿m3的堰塞湖,对下游天花板、黄角树两座水电站及下游3万余人造成极大威胁,需采取及时有效的应急处置措施。本文基于无量纲堆积体指标法判断堰塞湖溃决的可能性,总结该堰塞湖应急处置措施,并对不同开挖方案泄流槽的泄流能力及运用DB-IWHR程序的溃坝洪水对比分析,结果表明:实际采用的开挖深8 m、宽5 m泄流槽方案是最恰当的应急处置工程措施。此研究成果可供处理类似堰塞湖参考。

关 键 词:堰塞湖  溃坝洪水  DB-IWHR程序  泄流槽
收稿时间:2015/4/26 0:00:00

Key techniques for the emergency disposal of Hongshiyan landslide dam
WANG Lin,LI Shouyi,YU Shu,DU Xiaohu and DENG Gang.Key techniques for the emergency disposal of Hongshiyan landslide dam[J].Journal of China Institute of Water Resources and Hydropower Research,2015(4):284-289.
Authors:WANG Lin  LI Shouyi  YU Shu  DU Xiaohu and DENG Gang
Affiliation:College of Water Resources and Hydropower Engineering, Xi'an University of Technology, Xi'an 710048, China;College of Water Resources and Hydropower Engineering, Xi'an University of Technology, Xi'an 710048, China;Department of Geotechnical Engineering, IWHR, Beijing 100048, China;China Renewable Energy Engineering Institute, Beijing 100120, China;Department of Geotechnical Engineering, IWHR, Beijing 100048, China
Abstract:Hongshiyan landslide dam which formed on landslide at 600 m downstream of Hongshiyan Hydropower Station caused by"8·03" Ludian Yunnan earthquake blocked the Niulan river. It has a storage capacity of 260 million m3. The downstream hydropower stations(Tianhuaban and Huangjiaoshu) and 30,000 residents face the risk of overtopping if the landslide dam breaks. Taking timely and effective emergency measures is essential. This paper analyzes the dam break possibility based on Dimensionless Blockage Index and summarizes the emergency disposal measures. It studys on choosing discharge chute excavation programs of emergency disposal by analyzing discharge capacity and using DB-IWHR program to analyze contrastively dam break flood. It is considered that excavating discharge chute of depth which is 8 m deep and 5 m wide is the most appropriate engineering measures. This finding may be consulted in other emergency migigation works for landslide dams.
Keywords:landslide dam  dam break flood  DB-IWHR  discharge chute