首页 | 本学科首页   官方微博 | 高级检索  
     

景阳河大桥上承式钢管拱的吊装施工方案
引用本文:孙迎春,王路少.景阳河大桥上承式钢管拱的吊装施工方案[J].山西建筑,2007,33(34):145-146.
作者姓名:孙迎春  王路少
作者单位:中铁大桥局集团第三工程有限公司,广东,广州,510800
摘    要:结合具体工程实例,介绍了钢管拱安装的总体方案,分析了钢管拱安装体系的组成,提出了钢管拱的吊装施工工艺流程,详细地阐述了钢管拱的吊装施工措施,可供类似桥梁工程参考借鉴。

关 键 词:钢管拱  吊装  施工方案  安装体系
文章编号:1009-6825(2007)34-0145-02
修稿时间:2007-07-05

Lifting construction plan of deck steel tubular arch of Jingyanghe Bridge
SUN Ying-chun,WANG Lu-shao.Lifting construction plan of deck steel tubular arch of Jingyanghe Bridge[J].Shanxi Architecture,2007,33(34):145-146.
Authors:SUN Ying-chun  WANG Lu-shao
Affiliation:SUN Ying-chun WANG Lu-shao
Abstract:Combined with practical work general installation plan of steel tubular arch is introduced.Based upon analysis of the composition of the installation system practical construction technology and procedure are proposed for lifting as well as construction measures,in order to provide references for similar works.
Keywords:steel tubular arch  lifting  construction plan  installation system  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号