3m厚大体积混凝土超长冬期施工温度裂缝控制措施
引用本文:张德友.3m厚大体积混凝土超长冬期施工温度裂缝控制措施[J].宁夏工程技术,2011,10(1):72-74,79.
作者姓名:张德友
作者单位:宁夏建工集团电力建设分公司,宁夏,银川,750011
摘    要:大体积混凝土在冬期施工时容易出现温度裂缝和混凝土浇筑过程中受冻的情况.以银川市西夏热电厂一期工程储煤筒仓3m厚筏板基础施工为例,通过详细的温度计算,严格控制原材料质量、混凝土冬期设计配合比、入模温度,并采取合理的保温养护、测温等措施,有效地保证了工程的质量和施工进度,为今后大体积混凝土的设计施工提供了经验和依据.

关 键 词:大体积混凝土  冬期施工  温度裂缝  控制措施

Control measures for temperature cracks of 3m-thick mass concrete in winter
ZHANG Deyou.Control measures for temperature cracks of 3m-thick mass concrete in winter[J].Ningxia Engineering Technology,2011,10(1):72-74,79.
Authors:ZHANG Deyou
Affiliation:ZHANG Deyou (Ningxia Construction Group Power Construction Branch, Yinchuan 750011, China)
Abstract:The mass concrete tends to produce temperature crack and frost damage during winter construction. Take 3m-thick raft foundation construction of coal silo in the first phase project of Yinchuan Xixia Thermal Power Plant for example, the engineering construction quality and construction progress was guaranteed, by the temperature calculation of concrete, strictly controlling the raw material, the concrete mix design and entering temperature, adopting reasonable control measures such as insulated curing and temperature determination. This construction practice will provides a beneficial experience for the mass concrete construction in the future.
Keywords:mass concrete  winter construction  temperature crack  control measures