Pure and mixed strategies for the EOQ repair and waste disposal problem |
| |
Authors: | Knut Richter |
| |
Affiliation: | (1) Europa-Universität Viadrina, Große Scharrnstr. 59, D-15230 Frankfurt, Germany |
| |
Abstract: | In this paper the analysis of the EOQ repair and waste disposal model with variable setup numbers for production and repair within some collection time interval is continued. The cost analysis is now extended to the extreme waste disposal rates and it is shown that the pure (bang-bang) policy of either no waste disposal (total repair) or no repair (total waste disposal) dominates the strategy of mixing waste disposal and repair. Moreover, the different behavior of the minimum cost, of the optimal setup numbers, lot sizes and collection intervals for small and large waste disposal rates is discussed. |
| |
Keywords: | Production EOQ model waste disposal cost minimization remanufacturing |
本文献已被 SpringerLink 等数据库收录! |
|