高流态混凝土胶结堆石筑坝技术在电站建设中的应用
引用本文:文江云.高流态混凝土胶结堆石筑坝技术在电站建设中的应用[J].电网与水力发电进展,2012,28(2):93-97.
作者姓名:文江云
作者单位:新疆奎屯农七师勘测设计研究院(有限公司),新疆奎屯,833200
摘    要:静海水电站采用混凝土砌石重力坝作为水电站拦河坝,从方便施工和宜于质量控制两方面出发,拟用高流态混凝土胶结堆石筑坝技术,通过现场试验,论证了混凝土胶结堆石坝技术措施效果明显,该技术能够满足大坝设计要求,并且具有施工效率高、经济效益好、质量稳定等优点。

关 键 词:混凝土胶结堆石筑坝技术  配合比试验  静海水电站

Application of High Flowing Concrete Cementation and Rock Filled in the Construction of Power Station
Authors:WEN Jiang-yun
Affiliation:WEN Jiang-yun(Survey and Design Institute of Xinjiang Kuitun Production and Construction Corps Seven Division(Co.,Ltd.,) Kuitun 833200,Xinjiang,China)
Abstract:Jinghai Hydropower Station adopts concrete masonry gravity dam as hydropower dam. Considering of facilitating the construction and appropriate for quality control, the construction technology of cementation and rock filled with flowing concrete is a good choice. Through on-site test, the results show that the technology is very effective. The technology can meet the design requirements of the dam, and has the good construction efficiency, economic, and structure stability.
Keywords:concrete cementation and rock filled technology  mixture ratio test  Jinghai Hydropower Station