首页 | 本学科首页   官方微博 | 高级检索  
     

广珠铁路西南涌2号特大桥挂篮施工技术
引用本文:刘晓剑.广珠铁路西南涌2号特大桥挂篮施工技术[J].山西建筑,2009,35(33):339-340.
作者姓名:刘晓剑
作者单位:中铁十二局集团第三公司,山西,太原,030024 
摘    要:结合具体工程实例,介绍了特大桥挂篮的设计及施工技术,提出了挂篮施工标高控制措施,得出了该工程实际与理论基本吻合的结论,对推广悬浇挂篮施工有一定的意义。

关 键 词:大桥  挂篮  施工  标高控制

On construction technology of No. 2 super-large hanging basket of Xi'nan river on Guangdong-Zhuhai
LIU Xiao-jian.On construction technology of No. 2 super-large hanging basket of Xi'nan river on Guangdong-Zhuhai[J].Shanxi Architecture,2009,35(33):339-340.
Authors:LIU Xiao-jian
Affiliation:LIU Xiao-jian
Abstract:By combining with factual project,the paper introduces the design for the super-large hanging basket and its construction technology,points out the elevation control measures in the hanging basket construction,and concludes the construction is basically consistent with the theory,so it is significant to extend the suspension hanging basket construction.
Keywords:bridge  hanging basket  construction  elevation control
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号