浅谈建设工程四大目标之间的关系
引用本文:陈景安,李文辉. 浅谈建设工程四大目标之间的关系[J]. 山西建筑, 2007, 33(15): 218-219
作者姓名:陈景安  李文辉
作者单位:新疆乌苏市宏建建筑安装工程有限责任公司,新疆乌苏,833208
摘    要:详细阐述了建设工程“四大”目标之间的对立与统一关系,并对“四大”目标统一的优化计划从三个方面进行了论述,指出只有将“四大”目标作为一个系统统筹考虑,在实施过程中动态管理控制反复协调和平衡,才能实现最终目标。

关 键 词:建设工程  优化计划  动态管理  四大目标
文章编号:1009-6825(2007)15-0218-02
修稿时间:2007-01-17

Relationships among four major objectives of construction projects
CHEN Jing-an,LI Wen-hui. Relationships among four major objectives of construction projects[J]. Shanxi Architecture, 2007, 33(15): 218-219
Authors:CHEN Jing-an  LI Wen-hui
Affiliation:CHEN Jing-anLI Wen-hui
Abstract:relationships of the unity and opposites among four major objectives of construction projects are elaborated in detail.From three aspects optimization planning of four major objectives is discussed.Author points out that four major objectives should be considered as one system.Dynamic management control is essential for realization of ultimate objective.
Keywords:construction engineering   optimal planning   dynamic management   four objective