Project cash flow analysis in the presence of uncertainty in activity duration and cost
Authors:Alexander Maravas  John-Paris Pantouvakis
Affiliation:Centre for Construction Innovation, National Technical University of Athens, Athens, Greece
Abstract:The inherent uncertainty and imprecision in project scheduling have motivated the proposal of several fuzzy set theory based extensions of activity network scheduling techniques. Building upon these, a cash flow calculation methodology for projects including activities with fuzzy durations and/or costs is proposed in this paper. According to the proposed approach, the project cash flow is represented by an S-surface (as opposed to the traditional S-curve) ensuing by connecting S-curves at different risk possibility levels. The methodology is exemplified by estimating the working capital requirements in a real world road construction project. Furthermore, the benefits of the methodology and its subsequent computerization are discussed. It is believed that the proposed approach may also be useful for both evaluating project proposals during feasibility studies and for performing earned value analysis for project monitoring and control.
Keywords:Cash flow   Fuzzy project scheduling   S-curve   S-surface
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号