首页 | 本学科首页   官方微博 | 高级检索  
     

会宝岭铁矿全尾砂废石复合充填体沉降试验
引用本文:饶运章,张中亚,舒太镜,彭立正.会宝岭铁矿全尾砂废石复合充填体沉降试验[J].金属矿山,2015,44(11):37-41.
作者姓名:饶运章  张中亚  舒太镜  彭立正
作者单位:1.江西理工大学资源与环境工程学院,江西 赣州 341000;2.山东能源临沂矿业集团会宝岭铁矿,山东 临沂 277712
基金项目:* 国家自然科学基金项目(编号:51364010)。
摘    要:全尾砂废石复合充填体沉降是一个复杂的非牛顿流体与固体混合物的连续介质力学加载过程,难以通过经验估算或理论推导获得其沉降规律。为研究会宝岭铁矿全尾砂-废石复合充填体沉降问题,通过相似模型试验的方法,对不同比例(高度)全尾砂、废石组成的复合充填进行室内试验模拟。结果分析表明:复合充填体中废石所占比例与其总沉降量呈递减函数关系;复合充填体总沉降量与时间的拟合关系为递减对数关系,且拟合曲线在15 d时斜率明显减小,故在15 d后复合充填体沉降量趋于稳定,可进行顶板胶结作业;比较不同废石比例的复合充填体沉降稳定所需时间,1/2废石比例的复合充填体沉降稳定最快。

关 键 词:全尾砂  废石  复合充填体  沉降规律  模型试验  

Settlement Tests of Unclassified Tailings Waste Rock Compound Filling Body in Huibaoling Iron Mine
Rao Yunzhang,Zhang Zhongya,Shu Taijing,Peng Lizheng.Settlement Tests of Unclassified Tailings Waste Rock Compound Filling Body in Huibaoling Iron Mine[J].Metal Mine,2015,44(11):37-41.
Authors:Rao Yunzhang  Zhang Zhongya  Shu Taijing  Peng Lizheng
Affiliation:1.School of Resources and Environment Engineering,Jiangxi University of Science and Technology,Ganzhou 341000,China;2.Huibaoling Iron Mine,Shandong Energy Linyi Mining Group,Linyi 277712,China
Abstract:The settlement of unclassified tailings waste rock compound filling body is a complex continuum mechanics loading process of non-Newtonian fluid and solid mixture,so it is difficult to obtain the settlement laws through the theoretical derivation or experience.In order to investigate the settlement of unclassified tailings waste rock compound filling body in Huibaoling Iron Mine,the similarity model test method is adopted to make the indoor simulation experiment on composite filling body with different proportions (height) of unclassified tailings and waste rock.The results showed that the proportion of waste rocks in compound filling body has a decreasing function with the total settlement amount.The fitting of total settlement amount of the compound filling body with time shows a decreasing logarithmic relationship among them.And the fitting curve significantly declined at 15d,so the settlement of compound filling approached to be stable after 15d,and roof cementation can be operated.After contrast on the time that required by settlement of compound filling with different proportions of waste rock,compound filling body with 1/2 ratio of waste rock has the fastest settlement.
Keywords:Unclassified tailings  Waste rock  Compound filling body  Settlement law  Model test
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《金属矿山》浏览原始摘要信息
点击此处可从《金属矿山》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号