首页 | 本学科首页   官方微博 | 高级检索  
     


Recovery planning of industrial robots based on semantic information of failures and time-dependent utility
Abstract:Industrial robots are required to recover from temporary errors and continue operations under a changing environment. In this paper, we propose a recovery planning system that considers the semantic information behind errors during robotic actions. In order to establish general repair strategies for feasible recovery plans under uncertainties, the proposed system uses a conceptual graph based on case grammar and a Bayesian network that is dynamically constructed according to the semantic information. In addition, we tackle the problem that the wealth of the recovery plan depends on the uncertainty of execution costs against the deadline at the production site. The proposed system controls the decision model by using a time-dependent utility. We demonstrate the effectiveness of the proposed system through simulations of assembly tasks by multiple robots.
Keywords:Action planning  Error recovery  Repair strategy  Semantic information  Time-dependent utility
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号