Production scheduling of single-stage multi-product batch chemical processes with fixed batch sizes
Authors:MAGED M DESSOUKY  BRIAN A KIJOWSKI
Affiliation:  a Department of Industrial and Systems Engineering, University of Southern California, Los Angeles, CA, USA b Department of Mechanical and Industrial Engineering, University of Illinois, Urbana, IL, USA
Abstract:We address the problem of scheduling a single-stage multi-product batch chemical process with fixed batch sizes. We present a mixed-integer nonlinear programming model to determine the schedule of batches, the batch size, and the number of overtime shifts that satisfy the demand at minimum cost for this process. We introduce a polynomial-time algorithm to solve the problem when the processing times of all batches are identical and the setup and cleaning times are sequence-independent. The solution procedure is based on recognizing that the optimal fixed batch size is a member of a set whose cardinality is polynomial. Given a batch size, the problem may be formulated as an assignment problem. Thus, an optimal solution may be found by iteratively solving a polynomial number of assignment problems. This work was motivated by a pesticide manufacturing company in the design of a new plant where the assumptions of a single bottleneck machine, fixed batch sizes, sequence-independent setup times, and identical batch processing times are all valid. An example is developed for this application.
Keywords:
本文献已被 InformaWorld SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号