立井基岩段快速施工途径
引用本文:李银桥,兰毓胜.立井基岩段快速施工途径[J].焦作工学院学报,1999,18(3):193-196.
作者姓名:李银桥  兰毓胜
作者单位:中煤第四十九工程处(李银桥,李振峰),广西右江矿务局州景矿(兰毓胜),焦作煤炭工业学校(武书礼)
摘    要:宣东二矿主井基岩段采用短段掘砌混合作业方式施工,充分利用机械化配套设施,于1997年10月份创立井基岩段月成井1410m纪录.本文对其施工方法和施工经验进行介绍,并探讨了立井基岩段实现优质高效、快速施工的有效途径,为立井基岩段快速施工提供了依据.

关 键 词:基岩段  短段掘砌  机械化配套设施  快速施工

A Speedy Construction in the Baserock Section of the Vertical Shafts
LiYinqiao.A Speedy Construction in the Baserock Section of the Vertical Shafts[J].Journal of Jiaozuo Institute of Technology(Natural Science),1999,18(3):193-196.
Authors:LiYinqiao
Abstract:A short section driving and masonry mixed construction method, which a set of mechanized equipment are fully used, has been adopted to the baserock section of the main shaft of No2 Xuandong coal mine. In this way, a drilling depth of 1410m record in the baserock section has created in Oct1997. Some other construction performances and experiences are introduced and an efficienty way of reaching a high quality and speedy construction in the baserock section of the vertical shafts are also discassed. Then, an evidence for the speedy construction design has been provided.
Keywords:baserock section  short section drilling and mosonry  sets of mechanized equipment  speedy construction