首页 | 本学科首页   官方微博 | 高级检索  
     

核电厂流程整理和优化试点项目的实施
引用本文:陆秋生,朱洪涌. 核电厂流程整理和优化试点项目的实施[J]. 中国核电, 2010, 0(1): 70-73
作者姓名:陆秋生  朱洪涌
作者单位:江苏核电有限公司质量保证处;
摘    要:为使江苏核电有限公司(以下简称"JNPC")的质量管理体系的适用性、操作性得到进一步提升,从扩建工程的程序体系入手,引入跨行业的先进经验和在程序管理领域的良好实践,JNPC组织实施了流程整理和优化项目的规划及试点工作。希望通过项目的开展,能够实现业务过程端到端的管理,减少不增值流程。

关 键 词:核电厂  流程整理和优化

The implementation of pilot project for process arrangement and optimization in nuclear power plant
LU Qiu-sheng,ZHU Hong-yong. The implementation of pilot project for process arrangement and optimization in nuclear power plant[J]. China Nuclear Power, 2010, 0(1): 70-73
Authors:LU Qiu-sheng  ZHU Hong-yong
Affiliation:LU Qiu-sheng,ZHU Hong-yong(Quality Assurance Dept.of Jiangsu Nuclear Power Corporation,Lianyungang of Jiangsu Prov.222042,China)
Abstract:In order to further upgrade the applicability and maneuverability of the quality management system of Jiangsu Nuclear Power Corporation(JNPC), starting from the procedures system of Tianwan NPS extension project, JNPC performed the planning and pilot for process arrangement and optimization by introducing the advanced experience and excellent practice in this field from different trades and hopes to achieve the point-to-point process management, and reduce non-increment process.
Keywords:nuclear power plant  process arrangement and optimization  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号