首页 | 本学科首页   官方微博 | 高级检索  
     


Production inefficiency of electricity markets with hydro generation
Authors:Andy Philpott   Ziming Guan   Javad Khazaei  Golbon Zakeri
Affiliation:a Electric Power Optimization Centre (EPOC), Department of Engineering Science, University of Auckland, 70 Symonds Street, Auckland, New Zealand
Abstract:Electricity market designs that decentralize decision making for participants can lead to inefficiencies in the presence of nonconvexity or missing markets. This has been shown in the case of unit-commitment problems that can make a decentralized market equilibrium less efficient than a centrally planned solution. Less attention has been focused on systems with large amounts of hydro-electric generation. We describe the results of an empirical study of the New Zealand wholesale electricity market that attempts to quantify production efficiency losses by comparing market outcomes with a counterfactual central plan.
Keywords:Electricity market   Hydro-electricity   Stochastic inflows   Market power
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号