立井工作面预注浆补孔注浆施工
引用本文:周新勍,李凤国,刘成武,戚克辉.立井工作面预注浆补孔注浆施工[J].建井技术,2017,38(1).
作者姓名:周新勍  李凤国  刘成武  戚克辉
作者单位:1. 华煤集团有限公司 建安工程处,吉林 长春,130000;2. 山东黄金矿业股份有限公司 新城金矿,山东 莱州,261438
摘    要:立井工作面预注浆施工中,对于复杂地层,有时需增设注浆孔来确保注浆堵水效果。新城金矿滕家副立井工作面新增孔注浆施工中,通过对注浆孔口管设置加固片,在加固片上设置锚杆,打入止浆垫混凝土内锚固后,直接注入水泥-水玻璃双液浆固管。双液浆凝固后,埋设的新增孔口管能实现在不养护的条件下,直接打钻注浆;且注浆时能承受较大的注浆压力。这种施工方法能实现新增注浆孔的快速合理布置,缩短注浆施工工期,保证注浆效果;且操作简单,可行性强,在复杂地质条件工作面预注浆施工中,可大力推广应用。

关 键 词:立井  工作面预注浆  补孔注浆  孔口管  加固片

Grouting Construction with Additional Boreholes in Pre-Groutingat Mine Shaft Sinking Face
ZHOU Xin-qing,LI Feng-guo,LIU Cheng-wu,QI Ke-hui.Grouting Construction with Additional Boreholes in Pre-Groutingat Mine Shaft Sinking Face[J].Mine Construction Technology,2017,38(1).
Authors:ZHOU Xin-qing  LI Feng-guo  LIU Cheng-wu  QI Ke-hui
Abstract:In the pre-grouting construction at the mine shaft sinking face,additional grouting boreholes would be required to ensure the grouting water sealing effect especially in the complicated strata.In the additional borehole grouting at the Tengjia mine auxiliary shaft sinking face of Xincheng Gold Mine,the reinforced chips were applied to the grouting orifice tube.When the bolts were set on the reinforced chips and then the reinforced chips would be put in the concrete of the grouting cushion for the reinforcement,the cement-sodium silicate double grouts would be grouted to fix the tubes.When the double grouts consolidated,the additional orifice tube buried could be applied to drill borehole and grout under the condition of no curing.During the grouting process,high grouting pressure could be born.The construction method could realize the rapid and rational layout of the additional grouting borehole,could reduce the grouting construction period and could ensure the grouting effect.The operation would be simple and the feasibility would be strong.The method could be widely promoted and applied to the pre-grouting construction at the sinking face under the complicated geological condition.
Keywords:mine shaft  pre-grouting at mine shaft sinking face  grouting with additional boreholes  orifice tube  reinforced chip