首页 | 本学科首页   官方微博 | 高级检索  
     

普朗铜矿井下冰碛补给型泥石流启动机理试验研究
引用本文:牛向东,谢晋谊,侯克鹏,李争荣,汪德文.普朗铜矿井下冰碛补给型泥石流启动机理试验研究[J].有色金属工程,2020(7).
作者姓名:牛向东  谢晋谊  侯克鹏  李争荣  汪德文
作者单位:昆明理工大学国土资源工程学院,昆明理工大学国土资源工程学院,昆明理工大学国土资源工程学院,云南迪庆有色金属有限责任公司,中国有色金属工业昆明勘察设计研究院有限公司
摘    要:强降雨是诱发普朗铜矿井下冰碛补给型泥石流灾害的重要因素,以现场调查和室内模拟试验为研究手段,对普朗铜矿不同降雨强度条件下的井下冰碛补给型泥石流的启动机理进行研究。研究结果表明:1)强降雨为井下冰碛补给型泥石流形成提供水动力条件;2)纯矿石放矿过程中,地表冰碛物不会在矿石层中形成通道,在不同降雨强度下不会有井下泥石流的形成;3)地表冰碛物在矿石层中形成通道是井下泥石流形成的前提,有地表冰碛物放出时,室内降雨强度0.563mL/min时会形成具有较大能量的泥石流,0.293mL/min时会有泥石流发生的潜能,0.186mL/min时不会形成井下泥石流。研究对井下泥石流启动机理探究具有一定借鉴作用,同时对矿山泥石流灾害的预防、治理和管理措施具有指导意义。

关 键 词:自然崩落法  井下泥石流  降雨强度  启动机理  试验研究
收稿时间:2020/3/9 0:00:00
修稿时间:2020/3/11 0:00:00

Experimental Study on the Start-up Mechanism ofMoraine-Supplied Debris Flow in the Prang Copper Mine
NIU Xiangdong,XIE Jinyi,HOU Kepeng,LI Zhengrong and WANG Dewen.Experimental Study on the Start-up Mechanism ofMoraine-Supplied Debris Flow in the Prang Copper Mine[J].Nonferrous Metals Engineering,2020(7).
Authors:NIU Xiangdong  XIE Jinyi  HOU Kepeng  LI Zhengrong and WANG Dewen
Affiliation:School of Land and Resources Engineering,Kunming University of Science and Technology,School of Land and Resources Engineering,Kunming University of Science and Technology,School of Land and Resources Engineering,Kunming University of Science and Technology,Yunnan Diqing Nonferrous Metals Co,Ltd,China Nonferrous Metals Industry Kunming Survey Design Research Institute Co,Ltd
Abstract:Heavy rainfall is an important factor inducing the moraine-supply-type debris flow disaster in the underground of Pulang copper mine. In this paper, field investigations and laboratory simulation tests are used as research methods to study the start-up mechanism of underground moraine-supply debris flow at different rainfall intensity conditions in the Pulang copper mine. The results show that: (1) heavy rainfall provides hydrodynamic conditions for the formation of downhole moraine-supply debris flow; (2) during the process of pure ore mining, surface moraine does not form a channel in the ore layer, under different rainfall intensities There will be no formation of downhole debris flow; (3) The formation of channels by surface morain in the ore layer is a prerequisite for the formation of downhole debris flow. When the surface moraine is released, a large energy will be formed when the rainfall intensity is 0.563ml / min Debris flow, there is potential for debris flow to occur at rainfall intensity of 0.293ml / min, and there will be no downhole debris flow at rainfall intensity of 0.186ml / min. This paper provides a certain reference for the exploration of the mechanism of underground debris flow initiation, and also provides guidance for prevention, management and management measures of mine debris flow.
Keywords:natural avalanche method  underground debris flow  rainfall intensity  starting mechanism  experimental study
本文献已被 CNKI 等数据库收录!
点击此处可从《有色金属工程》浏览原始摘要信息
点击此处可从《有色金属工程》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号