基于选矿流程的尾矿优选组合膏体充填技术
引用本文:郭利杰,杨小聪,许文远,彭啸鹏,史采星,李宗楠.基于选矿流程的尾矿优选组合膏体充填技术[J].中国矿业,2017,26(4).
作者姓名:郭利杰  杨小聪  许文远  彭啸鹏  史采星  李宗楠
作者单位:北京矿冶研究总院,北京矿冶研究总院,北京矿冶研究总院,北京矿冶研究总院,北京矿冶研究总院,北京矿冶研究总院
基金项目:国家重点研发计划项目(2016YFC0600709),国家科技支撑计划项目(编号:2013BAB02B02),国家国际科技合作专项项目(编号:2014DFR70340)。
摘    要:为优化膏体充填骨料粒级级配,提出了基于选矿流程的尾矿优选组合膏体充填工艺技术。该技术统筹考虑充填方案、充填成本等因素,基于选矿流程多环节生产尾矿的条件,将不同级配、化学成分合理的尾矿按照一定的比例进行混合,制备出级配连续的混合尾矿。通过开展尾矿基础参数测试、沉降试验、析水试验、流动性试验研究,确定了基于选矿流程的充填技术工艺优化方案,并开展了工业现场验证。基于尾矿级配优化的膏体充填技术科学可行,具有广泛的适用性,是一种先进的矿山充填技术。

关 键 词:级配优化  选矿流程  膏体充填  尾矿
收稿时间:2017/3/20 0:00:00
修稿时间:2017/3/20 0:00:00

Industrial Practice on Optimizing Tailings Composition Combined with Ore Concentration Processes
Guo Li-jie,Yang Xiao-cong,Xu Wen-yuan,Peng Xiao-peng,Shi Cai-xing and Li Zong-nan.Industrial Practice on Optimizing Tailings Composition Combined with Ore Concentration Processes[J].China Mining Magazine,2017,26(4).
Authors:Guo Li-jie  Yang Xiao-cong  Xu Wen-yuan  Peng Xiao-peng  Shi Cai-xing and Li Zong-nan
Affiliation:Beijing General Research Institute of Mining Metallurgy,Beijing General Research Institute of Mining Metallurgy,Beijing General Research Institute of Mining Metallurgy,Beijing General Research Institute of Mining Metallurgy,Beijing General Research Institute of Mining Metallurgy,Beijing General Research Institute of Mining Metallurgy
Abstract:ABSTRACT: Cemented paste backfill (CPB) is increasingly applied in underground mines world-wide and has a broad prospect considering its benefits in environmental protection and ground control. During the paste production, a well-graded aggregate is critical for the achievement of CPB. Mine tailings from the outcome of ore-dressing plant are commonly used as the fill aggregate. However, it is difficult to obtain an ideal particle size distribution for the mine tailings which are roughly mixed with final residuum in ore concentration processes. In this study, a novel industrial method is proposed to select fill aggregates from different parts of ore-dressing processes. With combined design of concentration plant and backfill plant, the tailings with desired particle sizes and proportions during the mineral processing are chosen to produce CPB without disturbing the regular ore concentration. The problem of passively accepting final tailings from ore-dressing plant has been improved.
Keywords:gradation optimization    mineral processes    paste backfill    tailings  