首页 | 本学科首页   官方微博 | 高级检索  
     

高瓦斯多煤层大采高工作面覆岩裂隙演化规律研究
引用本文:张伟,许开立.高瓦斯多煤层大采高工作面覆岩裂隙演化规律研究[J].中国矿业,2017,26(3).
作者姓名:张伟  许开立
作者单位:东北大学 资源与土木工程学院 辽宁沈阳 110819,东北大学 资源与土木工程学院 辽宁沈阳 110819
基金项目:国家科技重大专项资助项目(编号:2016ZX05067);山西省科技重大专项资助项目(编号:MQ2015-01),辽宁省自然科学基金资助项目(编号:2013020137)
摘    要:高瓦斯多煤层矿井运用大采高技术以实现矿井高产高效,开采工艺不同导致工作面瓦斯涌出规律的变化。以沁水煤田15#煤层大采高工作面煤层赋存条件和覆岩分布特征为背景开展采动覆岩裂隙演化规律研究,运用UDEC数值模拟大采高工作面在不同推进距离时覆岩裂隙形态发育及位移量,并提出基于示踪原理的实测覆岩裂隙发育规律的验证方法。研究表明:大采高工作面推进至120m时,煤层上覆岩层裂隙极限发育高度为65m,大采高工作面上邻近层8#煤层处于采动卸压范围,示踪气体法现场测试数据验证了数值模拟的准确性。由于大采高工作面覆岩裂隙发育范围扩展至上邻近层8#煤层,所以工作面回采过程中应增加上邻近层瓦斯抽采工艺。

关 键 词:大采高工作面  覆岩  裂隙  数值模拟  示踪气体
收稿时间:2016/12/27 0:00:00
修稿时间:2017/2/17 0:00:00

Research on the Evolution Law of Overburden Rock Cracks on High-gas Multi-seam Large Mining Height Working Face
ZHANG Wei and XU Kai-li.Research on the Evolution Law of Overburden Rock Cracks on High-gas Multi-seam Large Mining Height Working Face[J].China Mining Magazine,2017,26(3).
Authors:ZHANG Wei and XU Kai-li
Affiliation:Shenyang institute of technology college of energy and water resource,Fushun,Shenyang institute of technology college of energy and water resource,Fushun
Abstract:Large mining height technology is used in high-gas multi-seam mines to realize high production and high efficiency, but a difference in mining technology may lead to a change in gas emission regularity on working face. This research was carried out on the evolution law of mining overburden rock cracks on the background of coal seam occurrence conditions and overburden rock distribution characteristics on a large mining height working face in No.15 Coal Seam, Qinshui Coalfield. The research used UDEC to numerically simulate the morphological development and displacement of overburden rock cracks on the large mining height working face at different advancing distances, and then a tracing principle-based validation method was put forward for measuring the development regularity of overburden rock cracks. According to the research, as the large mining height working face advanced to 120m, the limiting development height of the overburden rock cracks in the coal seam reached 65m, and No.8 Coal Seam, the upper neighboring coal seam of this large mining height working face, lied in the relief range of mining pressure. The field test data obtained by the tracer gas method validated the accuracy of the numerical simulation. Since the overburden rock cracks propagated to the upper neighboring coal seam No.8 Coal Seam, a gas extraction technology applying to the upper neighboring coal seam should be adopted in the stoping process on the working face.
Keywords:large cutting height working face  overburden rock  crack  numerical simulation  tracer gas
本文献已被 CNKI 等数据库收录!
点击此处可从《中国矿业》浏览原始摘要信息
点击此处可从《中国矿业》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号