首页 | 本学科首页   官方微博 | 高级检索  
     

斜井岩巷综掘机机械化配套快速施工
引用本文:王友新.斜井岩巷综掘机机械化配套快速施工[J].煤炭技术,2010,29(12).
作者姓名:王友新
摘    要:在大断面斜井井筒岩巷施工中,采用综掘机进行掘进、JK-2.5绞车配合矿车、行人车辅助运输的新型施工机械化配套作业线,基岩段最高月进尺187m/M。文中介绍了主要的施工方法及采用的措施,为同类工程施工提供相关借鉴经验。

关 键 词:斜井  岩巷  综掘机  快速施工

Rapid Operation of Rock Road Synthetical Digging Machine Matching in Slant Mine
WANG You-xin.Rapid Operation of Rock Road Synthetical Digging Machine Matching in Slant Mine[J].Coal Technology,2010,29(12).
Authors:WANG You-xin
Abstract:In big cross section slant shaft construction,uses new construction mechanization necessary production line with the synthetical digging machine,the JK-2.5 winch coordinating mine car,the man car axiliary haulage.The highest month footage of bedrock section is 187m/M.This article introduces the main construction way and the measures and provides the experience for the similar project construction.
Keywords:slant mine  rock road  synthesis digging machine  high-speed operation
本文献已被 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号