首页 | 本学科首页   官方微博 | 高级检索  
     

某铅锌矿近地表采空区稳定性分析及治理方案优化
引用本文:卢欣奇,李学锋,黄海斌,张勤彬.某铅锌矿近地表采空区稳定性分析及治理方案优化[J].金属矿山,2019,48(1):150-157.
作者姓名:卢欣奇  李学锋  黄海斌  张勤彬
作者单位:广西大学资源环境与材料学院,广西南宁,530000;广西大学资源环境与材料学院,广西南宁,530000;广西大学资源环境与材料学院,广西南宁,530000;广西大学资源环境与材料学院,广西南宁,530000
基金项目:基金项目:广西自然科学基金项目(编号:2011GXNSFA018020)。
摘    要:为了确保近地表采空区下部矿体开采安全,避免近地表采空区崩塌导致地表塌陷,将广西某铅锌矿现存的6个近地表采空区作为研究对象,针对可能出现的矿柱、顶板垮塌,展开基于数值模拟的稳定性分析及治理方案优化研究。根据该矿矿体及围岩的岩体力学参数,利用3DMine及Midas GTS NX建立数值模型,通过FLAC3D进行模型重构与计算分析,依据数值模拟分析结论及矿区实际情况,提出2种局部充填加固的治理方案,并利用FLAC3D对各方案的治理效果进行了模拟分析。结果表明:方案一及方案二均能达到转移或减小采空区矿柱及顶板相应的最大主应力、剪应力及拉应力的效果,同时减小塑性破坏区的面积;方案二的较大尺寸支护结构较方案一能更好地转移或减小顶板的最大主应力、剪应力,故确定方案二为最优方案。

关 键 词:采空区  稳定性分析  治理方案  数值模拟

Stability Analysis of Near-surface Goaf and the Optimization of Its Treatment Scheme in a Lead-zinc Mine
Lu Xinqi,Li Xuefeng,Huang Haibin,Zhang Qinbin.Stability Analysis of Near-surface Goaf and the Optimization of Its Treatment Scheme in a Lead-zinc Mine[J].Metal Mine,2019,48(1):150-157.
Authors:Lu Xinqi  Li Xuefeng  Huang Haibin  Zhang Qinbin
Affiliation:School of Resource, Environment and Materials, Guangxi University,Nanning 530000, China
Abstract:In order to ensure the safe mining of the lower ore body in the near-surface goaf, and avoid surface subsidence caused by the collapse of near-surface goaf, six near-surface goafs existing in a certain Lead-zinc Mine in Guangxi were taken as the research object to investigate the stability analysis on the pillar and roof that possibly collapse based on numerical simulation and optimize the related treatment schemes. According to the rock mechanics parameters of the ore body and the surrounding rock, a numerical model was established using 3DMine and Midas GTS NX, and the model was reconstructed and calculated by FLAC3D. According to the conclusion of numerical simulation analysis and the actual situation of mining area, two kinds of treatment schemes were proposed, and FLAC3D was used to simulate and analyze the governance effect of each scheme. Results showed that the scheme one and two transferred or reduced the related maximum principal stress, shear stress and tensile stress at the goaf pillar and the roof, and narrowed the plastic area;the large size supporting structure at scheme two can better transfer or reduce the maximum principal stress and shear stress of roof than the scheme one, thus finally determining the optimal treatment schemes.
Keywords:Goaf  Stability analysis  Treatment scheme  Numerical simulation
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《金属矿山》浏览原始摘要信息
点击此处可从《金属矿山》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号