首页 | 本学科首页   官方微博 | 高级检索  
     

煤矿区煤层气三区联动立体抽采理论与模式
引用本文:李国富,何辉,刘刚,焦海滨,刘星.煤矿区煤层气三区联动立体抽采理论与模式[J].煤炭科学技术,2012,40(10):7-11.
作者姓名:李国富  何辉  刘刚  焦海滨  刘星
作者单位:1. 晋城煤业集团煤层气产业发展局,山西晋城048006 中国矿业大学(北京)地球科学与测绘工程学院,北京100083
2. 晋城煤业集团煤层气产业发展局,山西晋城,048006
基金项目:国家科技重大专项资助项目(2011ZX05063)
摘    要:为了实现煤矿区煤炭与煤层气2种资源的安全高效协调开发,基于煤炭开发时空接替规律,将煤矿区划分为规划区、准备区、生产区3个区间,分别采用地面钻井排采、地面与井下联合抽采以及本煤层钻孔抽采等不同的瓦斯抽采技术以保证煤炭安全高效生产。根据煤矿安全生产容许最高瓦斯含量数学模型、煤层瓦斯压力数值模拟模型和煤层气立体抽采优化专家系统,创立了三区联动的区域递进式立体抽采模式(晋城模式),提高了煤炭资源采出率,实现了煤矿瓦斯井下抽采和地面原位抽采2个独立产业模式的有效衔接,解决了煤层气开发与煤炭开采的时空矛盾。

关 键 词:煤矿区  煤层气  立体抽采  规划区  准备区  生产区  三区联动

Three Region Linkage Three-Dimensional Gas Drainage Theory and Mode of Coal Bed Methane in Coal Mining Area
LI Guo-fu,HE Hui,LIU Gang,JIAO Hai-bin,LIU Xing.Three Region Linkage Three-Dimensional Gas Drainage Theory and Mode of Coal Bed Methane in Coal Mining Area[J].Coal Science and Technology,2012,40(10):7-11.
Authors:LI Guo-fu  HE Hui  LIU Gang  JIAO Hai-bin  LIU Xing
Affiliation:1(1.Coal Bed Methane Industrial Development Bureau,Jincheng Coal Mining Group,Jincheng 048006,China; 2.School of Geosciences and Mapping Engineering,China University of Mining and Technology(Beijing),Beijing 100083,China)
Abstract:In order to realize the safety and high efficient coordinative development of coal and coal bed methane resources in the coal mining area,based on the time and space replacing law of the coal development,the coal mining area was divided into three regions,including the planning region,preparation region and production region.The gas drainage with the surface drilling wells,the combined drainage with the surface and underground boreholes,the gas drainage in the mining seam and different gas drainage technology were individually applied to ensure the safety and high efficient coal production.According to the mathematics model of the max gas content allowed by the coal mine production,the numerical model of the seam gas pressure and the optimized experts system of the coal bed methane drainage,a regional progressive three-dimensional gas drainage model(Jincheng Mode) of three region linkage was created.The recovery rate of the coal resources was improved,an effective connection of the industrial models with the underground mine gas drainage and the surface in-place gas drainage could be realized and the time and space contradiction between the coal bed methane development and the coal mining was solved.
Keywords:coal mining area  coal bed methane  three-dimensional gas drainage  planning region  preparation region  production region  three region linkage
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号