首页 | 本学科首页   官方微博 | 高级检索  
     

特大型水平矿柱稳定性数值模拟
引用本文:赵其祯,郭慧高,张海军.特大型水平矿柱稳定性数值模拟[J].有色金属(矿山部分),2008,60(3):28-31.
作者姓名:赵其祯  郭慧高  张海军
作者单位:金川集团有限公司,甘肃金昌,737100
摘    要:金川二矿区采用多中段大面积连续回采工艺,水平矿柱开采稳定性是关系到二矿区乃至整个金川集团公司能否持续稳步发展的关键技术问题。采用FLAC三维有限元数值分析方法对此进行了研究,研究表明,在多中段回采过程中,水平矿柱的开采是个平稳回采过程,今后水平矿柱回采不会出现应力过大集中,也不可能出现水平矿柱灾变失稳。

关 键 词:水平矿柱  工程地质  数值模拟  稳定性
文章编号:1671-4172(2008)03-0028-04

Numerical Simulation on Stability of Extra Large Horizontal Pillar
Authors:ZHAO Qizhen  GUO Huigao  ZHANG Haijun
Abstract:Jinchuan No.2 mine is using a multi-level large-area continuously mining technology.The mining stability of horizontal pillars is the key technology related to the persistent and steady development of the No.2 mine and whole Jinchuan Group Ltd.FLAC-3D numerical simulation is adopted in this study.The results show that the mining of horizontal pillars is a smooth recovery process in the period of multi-level mining,there is no high concentration of stress in the future mining of horizontal pillar,indicating that no catastrophic instability of the horizontal pillar will occur.
Keywords:horizontal pillar  engineering geology  numerical simulation  stability
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《有色金属(矿山部分)》浏览原始摘要信息
点击此处可从《有色金属(矿山部分)》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号