扬巴一体化基地建设吹填设计 |
| |
引用本文: | 朱国胜,周欣华,定培中,胡先举,方宗明.扬巴一体化基地建设吹填设计[J].工程设计与建设,2005,37(1):32-35. |
| |
作者姓名: | 朱国胜 周欣华 定培中 胡先举 方宗明 |
| |
作者单位: | [1]长江科学院土工研究所,湖北武汉430010 [2]武汉大学土建学院,湖北武汉430072 |
| |
摘 要: | 对大型的场地平整工程———扬巴I区场地吹填设计进行了详细介绍,设计根据建设场地粘土料源紧张的特点,将河道疏浚与场地填筑完美地结合起来,为吹填设计积累了经验。
|
关 键 词: | 场地平整 吹填 设计 基地 |
Hydraulic fill design for integrated base construction in Yangba |
| |
Authors: | Zhu Guosheng Zhou Xinhua Ding Peizhong Hu Xianju Fang Zongming |
| |
Abstract: | The large sized ground leveling project——hydraulic fill design of site in I area of Yangba was introduced in detail. Based on the characteristics that the clay material supply is in shortage in construction site, river dredging and site landfill were combined perfectly in the design, and experience for hydraulic fill design was accumulated. |
| |
Keywords: | site leveling hydraulic fill design base |
本文献已被 CNKI 维普 等数据库收录! |
|