25 MW背压式汽轮发电机组控制系统的改造
引用本文:李庆斌.25 MW背压式汽轮发电机组控制系统的改造[J].冶金动力,2007(3):44-46.
作者姓名:李庆斌
作者单位:本溪钢铁公司发电厂,辽宁本溪,117021
摘    要:介绍了本钢发电厂原25 MW背压式汽轮发电机组存在调速系统稳定性差、波动大等问题,对机组进行了DEH改造,解决了机组负荷波动问题,提高了机组运行的安全性、稳定性。

关 键 词:汽轮发电机  电液调节  改造
文章编号:1006-6764(2007)034)044-03
收稿时间:2006-12-31
修稿时间:2006-12-31

Reconstruction of Control System of 25 MW Back-Pressure Turbo-Generator Unit
LI Qing-bin.Reconstruction of Control System of 25 MW Back-Pressure Turbo-Generator Unit[J].Metallurgical Power,2007(3):44-46.
Authors:LI Qing-bin
Abstract:The problems of poor stability and large fluctuation of the speed governing system for 25MW back-pressure turbo-generator unit of the former power plant of Benxi Iron & Steel Co.were presented.DEH reconstruction was carried out for this unit,which solved the problem of load fluctuation of the unit and increased operation safety and stability of the unit.
Keywords:turbo-generator  electro-hydraulic conditioning  reconstruction
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号