首页 | 本学科首页   官方微博 | 高级检索  
     

地下矿山盘区脉外斜坡道采准应用实践
引用本文:赵永和,吴已成.地下矿山盘区脉外斜坡道采准应用实践[J].铜业工程,2009(4):23-24,28.
作者姓名:赵永和  吴已成
作者单位:江西铜业集团公司武山铜矿,江西,瑞昌,332204
摘    要:武山铜矿从1992年起开始使用下向水砂分层充填采矿法,采用下盘水平分段无轨道采准,随着采矿设备和采矿方法的改变,原有采准工艺的弊端逐渐暴露出来,经济效益已不明显。本文总结多年的生产实践,详细阐述了新采准工艺的各种优点和适用性。

关 键 词:盘区脉外斜坡道采准  胶结充填

A Practice to the Mining Preparation of Underground Decline of the Vein
ZHAO Yong-he,WU Yi-cheng.A Practice to the Mining Preparation of Underground Decline of the Vein[J].Copper Engineering,2009(4):23-24,28.
Authors:ZHAO Yong-he  WU Yi-cheng
Affiliation:ZHAO Yong - he, WU Yi - cheng ( Wushan Copper Mine ofJCC, Ruichang 332204 , Jiangxi, China)
Abstract:Wushan copper mine has used underhand sand backfilling mining method since 1992, with non - railed preparation for foot wall sublevel. With the changes of traditional mining equipments and method, the weakness of original preparation of mining is becoming more and more obvious, and the economic benefit is going down. This article introduces a new way of preparation of mining, as well as its advantages and application.
Keywords:Mining Preparation of Decline of the Vein  Cemented Backfilling
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号