首页 | 本学科首页   官方微博 | 高级检索  
     

针对某钢铁企业自发电和外购电采用二分法的分析研究
引用本文:刘精宇,蔡九菊,杨靖辉.针对某钢铁企业自发电和外购电采用二分法的分析研究[J].中国冶金,2014,25(7):60-63.
作者姓名:刘精宇  蔡九菊  杨靖辉
作者单位:东北大学国家环境保护生态工业重点实验室, 辽宁 沈阳 110819
基金项目:国家高技术项目基金重点资助项目(2008AA042901)
摘    要:电力是钢铁企业生产中的一种重要能源,在整个流程的作业中具有举足轻重的地位。由于钢铁企业电力主要来源于两个部分,一个是自发电,另一个是外购电,如何合理搭配它们之间的比例就尤为重要。开展科学合理的电力生产和分析,对于电力生产调度、减少企业的经济成本,是一项很重要的工作。运用二分查找算法对钢铁联合企业的电力进行分析,阐述了其原理,并通过实例应用,说明该钢铁企业外购电比例为29.5%为最经济,与企业实际情况相符合。

关 键 词:电力  自产电  外购电  二分查找算法  

Analitical Research of Self-Generating Electricity and Outsourcing Electricity by Using the Binary Search Algorithm in an Iron and Steel Enterprise
LIU Jing-yu,CAI Jiu-ju,YANG Jing-hui.Analitical Research of Self-Generating Electricity and Outsourcing Electricity by Using the Binary Search Algorithm in an Iron and Steel Enterprise[J].China Metallurgy,2014,25(7):60-63.
Authors:LIU Jing-yu  CAI Jiu-ju  YANG Jing-hui
Affiliation:SEP Key Laboratory on Eco-Industry, Northeastern University, Shenyang 110819, Liaoning, China
Abstract:Electricity is an important energy in the production process of iron and steel factory,which plays a decisive role in the flow of operation.Electricity mainly comes from two origins,one is self-generating electricity of the enterprise,and the other one is outsourcing electricity.How to reasonably allocate the ratio between them is particularly important.Carrying out scientific and rational power production and analysis is a very important task for production scheduling and reducing economic costs.The power of iron and steel complex was analysed using binary search algorithm,and its principle was expounded.Through the illustration of the application of an example,it shows that the outsourcing electricity accounting for 29.5%is the most cost-optimal condition,which coincides with the actual situation.
Keywords:electric power  self-generating electricity  outsourcing electricity  binary search algorithm
本文献已被 CNKI 维普 等数据库收录!
点击此处可从《中国冶金》浏览原始摘要信息
点击此处可从《中国冶金》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号