在地形图上用断面法求算土方量
引用本文:朱永刚.在地形图上用断面法求算土方量[J].中国锰业,2011,29(3):35-36.
作者姓名:朱永刚
作者单位:云南文山斗南锰业股份有限公司,云南 砚山,663101
摘    要:在厂房建设规划用地中,经常碰到要在地形图上计算土方量。最常用的求算方法有2种:断面法和方格法。由于方格法计算繁琐,工作量大,而断面法计算方便,易掌握。

关 键 词:地形图  求算  土方量

Beg to Calculate Soil a Square with the Cross Section Method on the Geography Diagram Quantity
ZHU Yonggang.Beg to Calculate Soil a Square with the Cross Section Method on the Geography Diagram Quantity[J].China's Manganese Industry,2011,29(3):35-36.
Authors:ZHU Yonggang
Affiliation:ZHU Yonggang(Yunnan Wenshan Dounan Manganese Industry Co.,Ltd,Yanshan,Yunnan 663101,China)
Abstract:Constucting a programming to use ground in the factory premises in,we usually run to be best plan in the geography diagram calculate the soil amount of square.2 kinds of methods in common:one is cross section method;the other is the square's space method.
Keywords:The geography diagram  Begs to calculate soil  Square to measure  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号