首页 | 本学科首页   官方微博 | 高级检索  
     

小浪底枢纽进水塔上游形成高滩深槽的过程
引用本文:窦国仁,王国兵,于为信,高亚军.小浪底枢纽进水塔上游形成高滩深槽的过程[J].人民黄河,1994(10).
作者姓名:窦国仁  王国兵  于为信  高亚军
作者单位:水利部南京水利科学研究院
摘    要:小浪底枢纽进入正常运用阶段后,库水位将在230~254m之间变动,随着蓄水位的升降,进水塔上游将形成高滩深槽的河床形态。文中根据1:80正态泥沙模型对1950~1970年共21个水沙系列年进行了模拟试验,对高滩深槽的形成过程及有关泥沙问题进行了分析和预报。

关 键 词:高滩深槽,泥沙模型试验,小浪底枢纽

Formation of High Floodplain and Deep-cut Channel Upstream of the Xiaolangdi Intake Towers
Don Guoren et al..Formation of High Floodplain and Deep-cut Channel Upstream of the Xiaolangdi Intake Towers[J].Yellow River,1994(10).
Authors:Don Guoren
Abstract:During the normal operation period of the Xiaolangdi Reservoir,the water level will fluctuatebetween 254 and 300m:The configuration of the river bed upstream of the intake towers will take theshape of high floodland and deep-cut channel as the water level fluctuates. The paper describes thesimulation, using the 1: 80 sediment model, of 21 water-sediment series from 1950-1970. Also, itanalyzes and predicts such formation and related sediment problems.
Keywords:high floodland and deep-cut channel  simulation  Xiaolangdi Multipurpose Dam Project
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号