Abstract: | Conclusion Protection of the Sayano-Shushenskoe spillway from cavitation erosion is achieved by an aeration sill behind the radial gate
and an aeration groove at elevation 35.25 m. The air content in the near-bottom layer (without consideration of its increase
in the prototype) will be at least 6–8%, which is sufficient to eliminate cavitation erosion. As a consequence it seems possible
to reduce the grade of concrete in the spillway with a strength of 400 kgf/ cm2 to grade 300 kgf/cm2. Protection of the upper concrete-hauling trestle from splashes is provided by deflectors.
Translated from Gidrotekhnicheskoe Stroitel'stvo, No. 1, pp. 10–14, January, 1978. |