首页 | 本学科首页   官方微博 | 高级检索  
     

面向航运和发电的三峡梯级汛期综合运用
引用本文:周建中,李纯龙,陈芳,张勇传.面向航运和发电的三峡梯级汛期综合运用[J].水利学报,2017,48(1):31-40.
作者姓名:周建中  李纯龙  陈芳  张勇传
作者单位:华中科技大学 水电与数字化工程学院, 湖北 武汉 430074,华中科技大学 水电与数字化工程学院, 湖北 武汉 430074;中国三峡建设管理有限公司, 四川 成都 610041,华中科技大学 水电与数字化工程学院, 湖北 武汉 430074,华中科技大学 水电与数字化工程学院, 湖北 武汉 430074
基金项目:国家自然科学基金重大研究计划重点项目(91547208);国家自然科学基金重点项目(51239004);国家自然科学基金面上项目(515279107)
摘    要:针对三峡梯级汛期防洪、航运和发电综合运用问题,提出了基于运行水位-入库流量-下泄流量边界的防洪调度方式,推求了下泄流量-通航保证率间映射关系以量化航运效益,进而建立了基于多目标优化调度的汛期综合运用模型;考虑不同的防洪、航运和发电优先次序,制定了6种不同的汛期综合运用方案,结合已有的设计方案和2009年优化方案,进行了长系列历史实测径流和典型设计频率洪水的调度模拟。结果表明,相比较于2009年优化方案,依次考虑下游防洪、航运调度和发电调度的综合运用方案,能够在确保上下游防洪安全的同时,将通航保证率从79.08%提高到83.42%,汛期梯级发电量从644.27亿k W·h提高到664.42亿k W·h。

关 键 词:三峡梯级  防洪安全  航运调度  发电调度  汛期综合运用
收稿时间:2016/1/15 0:00:00

Integrated utilization of the Three Gorges Cascade for navigation and power generation in flood season
ZHOU Jianhzong,LI Chunlong,CHEN Fang and ZHANG Yongchuan.Integrated utilization of the Three Gorges Cascade for navigation and power generation in flood season[J].Journal of Hydraulic Engineering,2017,48(1):31-40.
Authors:ZHOU Jianhzong  LI Chunlong  CHEN Fang and ZHANG Yongchuan
Affiliation:School of Hydropower and Information Engineering, Huazhong University of Science and Technology, Wuhan 430074, China,School of Hydropower and Information Engineering, Huazhong University of Science and Technology, Wuhan 430074, China;China Three Gorges Projects Development Company Linited, Chengdu 610041, China,School of Hydropower and Information Engineering, Huazhong University of Science and Technology, Wuhan 430074, China and School of Hydropower and Information Engineering, Huazhong University of Science and Technology, Wuhan 430074, China
Abstract:The Three Gorges Cascade undertakes the tasks of flood control, navigation and power generation, while they often conflict with each other in flood season. In order to solve the problem, this paper presents a flood control mode with water level-inflow-outflow boundary, and drafts the relationship between outflow and navigation rate for quantifying navigation benefit. On this basis, an integrated utilization model of multi-objective optimal operation in flood season is proposed. According to the priorities of different objectives,6 schemes of integrated utilization in flood season are drafted. With design scheme and 2009 optimal scheme, these integrated schemes are applied to the simulation in historical inflows and design floods for verifying their effectiveness. The results show that the integrated scheme which considers downstream flood control, navigation, power generation in turn has better performance when compared to 2009 optimal scheme. The navigation rate is enhanced to 83.42% from 79.08%,the total power generation is increased to 664.42 from 644.27 billion kWh, while upstream safety and downstream safety of flood control are both ensured.
Keywords:Three Gorges Cascade  flood control safety  navigation  power generation  integrated utilization in flood season
本文献已被 CNKI 等数据库收录!
点击此处可从《水利学报》浏览原始摘要信息
点击此处可从《水利学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号