首页 | 本学科首页   官方微博 | 高级检索  
     

跨流域供水水库群联合调度规则研究
引用本文:郭旭宁,胡铁松,吕一兵,张涛.跨流域供水水库群联合调度规则研究[J].水利学报,2012,43(7):757-766.
作者姓名:郭旭宁  胡铁松  吕一兵  张涛
作者单位:1. 武汉大学水资源与水电工程科学国家重点实验室,湖北武汉,430072
2. 长江大学信息与数学学院,湖北荆州,434023
3. 武汉大学水资源与水电工程科学国家重点实验室,湖北武汉430072 长江大学信息与数学学院,湖北荆州434023
基金项目:基金项目:国家自然科学基金项目,武汉大学2008年博士研究生(含1+4)自主科研项目,教育部博士点基金项目,武汉大学博士研究生短期出国(境)研修专项经费
摘    要:针对跨流域供水水库群联合调度存在的主从递阶结构,提出了调水规则和供水规则相结合的跨流域供水水库群联合调度规则。其中,调水规则由一组基于各水库蓄水量的调水控制线表示,根据其间的相对位置关系,决定是否调水,调水量如何分配等;供水规则由各库供水调度图表示,对应于不同用水户的限制供水线将水库的兴利库容分为若干调度区。建立了适合于主从递阶结构的水库群联合调度二层规划模型,采用并行种群混合进化的粒子群算法对模型进行求解。中国北方某大型跨流域调水工程的实例研究证明了模型的合理性和有效性。

关 键 词:跨流域调水  水库群  调、供水规则  二层规划  改进粒子群

Multi-reservoir operating rule in inter-basin water transfer-supply project
GUO Xu-ning,HU Tie-song,LU Yi-bing and ZHANG Tao.Multi-reservoir operating rule in inter-basin water transfer-supply project[J].Journal of Hydraulic Engineering,2012,43(7):757-766.
Authors:GUO Xu-ning  HU Tie-song  LU Yi-bing and ZHANG Tao
Affiliation:1,2 (1. Wuhan University,Wuhan 430072,China;2. Yangtze University,Jingzhou 434023,China)
Abstract:In view of the Stackelberg structure of the multi-reservoir joint operation problem in inter-basin water transfer-supply project, this paper proposes a multi-reservoir joint operation policy, which consists of water transfer rule and water supply rule. In this study, a set of water transfer rule curves based on the storage of individual reservoir in the system is employed to illustrate the water transfer rule, which determines the starting conditions of water transfer and the allocation of the transferred water. The water supply rule is presented using an operation chart, the hedging rule curves of which for each water user divide the reservoir active storage into several operation zones. Besides, this paper proposes a bi-level programming (BLP) model for the Stackelberg structure of the inter-basin multi-reservoir joint operation problem, which includes the upper-level model for water transfer and the lower-level model for water supply. The improved particle swarm optimization algorithm is employed to solve the BLP model. An inter-basin water transfer project in North China is taken as the case study to verify the reasonability and validity of the model.
Keywords:inter-basin water transfer  muhi-reservoir  water-transfer and water-supply rule  the BLP model  improved PSO
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《水利学报》浏览原始摘要信息
点击此处可从《水利学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号