三峡船闸高边坡渗流场三维有限元分析
引用本文:谢红,任大春.三峡船闸高边坡渗流场三维有限元分析[J].人民长江,1996,27(3):6-9.
作者姓名:谢红  任大春
作者单位:长江科学院土工所
摘    要:三峡永久船闸全部在山体中开挖形成,主体结构总长1607m,开挖边坡最高达170m。船闸区域裂隙及陡倾角断层比较发育,渗流问题是影响船闸高边坡稳定的关键因素之一。对船闸区域高边坡裂隙岩体中的渗流场进行了三维有限元计算,分析了船闸区岩体开挖前后的渗流分布规律和在开挖边坡岩体中设置不同排水设施的排水效果。分析结果表明:船闸开挖后,边坡岩体内的地下水位比较高,出逸点高出闸底板20 ̄80m。在边坡岩体中同时

关 键 词:船闸  开挖  渗流  有限元法  三峡  水利枢纽

3-D finite element analysis for high excavated slope seepage at Three Gorges shiplocks
Xie Hong, Ren Dachun.3-D finite element analysis for high excavated slope seepage at Three Gorges shiplocks[J].Yangtze River,1996,27(3):6-9.
Authors:Xie Hong  Ren Dachun
Affiliation:Xie Hong; Ren Dachun
Abstract:The permanent shiplocks of Three Gorges Project are constructed by deeply excavating the rock mass,with their main structures'total length of 1607 m and the highest excavated slope of up to 170 m.In the shiplock area there are comparatively developed fissures and faults of steep dip angle. The seepage problem is one of key factors affecting the stability of high slopes in the shiplock area. 3-D finite element analysis has been carried out on analysing seepage state in the high slopes before and after excavating the rock mass in the vicinity of shiplocks and determining effects of various drainage systems in the excavated slopes. The analysing results show that after the rock mass excavation, the ground water tables behind excavated slopes are still comparatively high,the exit points of seepage flow are 20-80 m above the corresponding shiplock's floors. The drainage system of combining drainage tunnels with drainage hole curtains (hole spacing 2 m)in the slope rock mass works effectively. Additional seepage control measures adopted on the upper part and the slope surface of rock mass may contribute to an even better effect.
Keywords:words Lock Excavation Seepage calculation Finite element method Sanxia Multipurpose Project  