首页 | 本学科首页   官方微博 | 高级检索  
     

阶梯式消能工与掺气墩在工程中的联合运用
引用本文:王自明,王斌,包中进.阶梯式消能工与掺气墩在工程中的联合运用[J].人民长江,2016,47(15):78-81.
作者姓名:王自明  王斌  包中进
作者单位:浙江省水利河口研究院,浙江杭州,310020
基金项目:浙江省科技计划项目(2015F50012)
摘    要:为使溢洪道具有较好的泄流条件,提高消能效率同时节省投资,提出了阶梯式溢洪道与掺气墩相结合的联合消能方式。以某水库溢洪道改造工程为例,对溢洪道的阶梯尺寸、掺气墩的结构及布置型式进行了探讨,最终泄槽段采用了1 m的阶梯形式与前倾30°的圆柱形掺气墩相结合的联合消能方式。试验结果表明,阶梯式消能工和掺气墩联合运用消能效果优异,水流条件明显改善。

关 键 词:阶梯式消能工    掺气墩    模型试验    溢洪道  

Research on joint application of stepped energy dissipator and aeration piers
Abstract:The technology of stepped spillway combined with aeration piers are proposed to get better flow condition, sufficient energy dissipation and save the engineering investment. Based on the spillway reconstruction project of a reservoir, the spillway step size, aeration pier structure and layout were discussed and compared. The scheme of 1m stepped spillway and cylindrical aerated pier with forward leaning 30° was selected. The physical model test results show that joint application of stepped energy dissipator and aeration piers is excellent for energy dissipation and can improve the flow conditions as well.
Keywords:stepped energy dissipation buildings  aerated pier  physical model test  spillway  
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《人民长江》浏览原始摘要信息
点击此处可从《人民长江》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号