叶巴滩水电工程施工初期导流标准优选
引用本文:张超.叶巴滩水电工程施工初期导流标准优选[J].人民长江,2016,47(16):58-61.
作者姓名:张超
作者单位:中国电建集团 成都勘测设计研究院有限公司,四川 成都,610072
基金项目:成都勘测设计院科研资助项目(P228-2014)
摘    要:叶巴滩水电工程规模巨大,施工难度高,采用科学的方法优选出安全、经济、合理的施工初期导流标准意义重大。结合该工程施工期特点,基于风险分析理论,从历史洪水、实测洪水、初期导流风险率、风险决策等多方面展开了系统分析。结果表明,叶巴滩水电站施工初期导流标准选择20 a一遇洪水是科学合理的。分析方法可为高拱坝施工初期导流标准的优选提供借鉴。

关 键 词:初期导流标准    风险决策    历史洪水    实测洪水    叶巴滩水电工程  

Optimization and selection of river diversion standard in initial construction stage of Yebatan Hydroelectric Project
Abstract:Yebatan Hydroelectric Project is characterized as large scale and very difficult in construction, so adopting scientific method to choose safe, economic and reasonable construction diversion standard is important. According to the project character-istics during the construction stage, and based on risk analysis theory, a systematic analysis was carried out from several aspects such as historical flood, measured flood, initial river diversion risk and risk decision. The analysis results show that using 20-year-frequency flood as the diversion standard during initial construction stage is scientific and reasonable. The analysis results can provide reference for river diversion standard optimization of high arch dams during initial construction stage.
Keywords:river diversion standards in initial construction stage  risk decision  historical flood  measured flood  Yebatan Hy-droelectric Project