首页 | 本学科首页   官方微博 | 高级检索  
     

积石峡面板堆石坝复杂渗流场有限元精细模拟
引用本文:刘昌军,丁留谦,徐泽平,蔡新合,张顺福.积石峡面板堆石坝复杂渗流场有限元精细模拟[J].人民长江,2012,43(5):54-58.
作者姓名:刘昌军  丁留谦  徐泽平  蔡新合  张顺福
作者单位:1. 中国水利水电科学研究院 防洪抗旱减灾研究所,北京,100038
2. 中国水电顾问集团 西北勘测设计研究院,陕西 西安,710065
基金项目:国家国际科技合作计划资助项目,国家“十一五”科技支撑课题
摘    要:运用自主研发的三维渗流有限元可视化分析软件GWSS,对积石峡面板堆石坝的坝体(包括面板、过渡层、排水层、堆石料等)、坝基、防渗帷幕以及泄洪洞和底孔排沙洞等结构进行了精细建模。在此基础上采用求解有自由面的改进截止负压法、隧洞子结构法和求解大型稀疏矩阵的预处理共轭梯度算法对积石峡面板堆石坝复杂渗流场进行了数值模拟。重点研究了面板和防渗帷幕联合作用下渗流场分布特征和防渗效果,以及泄洪洞和底孔排沙洞对大坝渗流场的影响等。计算结果表明,在正常运行条件下,面板结合防渗帷幕能够起到很好的防渗作用,坝体内自由面较低,左岸底孔排沙洞和泄洪洞也起到了很好的排水作用,大大降低了左岸山体的地下水位,有利于大坝和岸坡的稳定。

关 键 词:精细模似  复杂渗流场  地下洞室  防渗效果  面板堆石坝

Finite element fine simulation of complicated seepage field of concrete face rockfill dam of Jishixia
LIU Changjun , DING Liuqian , XU Zeping , CAI Xinhe , ZHANG Shunfu.Finite element fine simulation of complicated seepage field of concrete face rockfill dam of Jishixia[J].Yangtze River,2012,43(5):54-58.
Authors:LIU Changjun  DING Liuqian  XU Zeping  CAI Xinhe  ZHANG Shunfu
Affiliation:1(1.Department of Water Hazard Research,China Institute of Water Resources and Hydropower Research,Beijing 100038,China;2.Hydrochina Xibei Engineering Corporation,Xi′an 710065,China)
Abstract:Using the visualization finite element analysis software "Ground Water Simulation System"(GWSS),we conduct precise modeling of Jishixia concrete face rockfill dam.It covers the modeling of dam body(concrete face,transition layer,drainage layer,rockfill materials),dam foundation,anti-seepage curtain,spillway tunnel and bottom desilting tunnel.Numerical simulation of the complicated seepage field is performed by improved cut off negative pressure method with free surface evolution,tunnel substructure and Preconditioned Conjugate Gradient algorithm for solving large sparse matrix.Seepage distribution characteristics and seepage control effect for the combination of concrete face and anti-seepage curtain as well as the influence of spillway tunnel and bottom desilting tunnel on the seepage flow in the dam are studied.Numerical simulation results show that,the combination of concrete face and anti-seepage curtain does well in seepage control under normal operation condition.Meanwhile,the bottom desilting tunnel and spillway tunnel on the left bank play a positive role.They reduce the groundwater level of left bank significantly and are favorable to the stability of the dam and bank slope.
Keywords:fine simulation  complicated seepage field  underground cavern  anti-seepage effect  concrete face rockfill dam
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《人民长江》浏览原始摘要信息
点击此处可从《人民长江》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号