尼尔基水利枢纽工程二期导截流施工
引用本文:李伟,赵艳梅,李剑峰,陈伟.尼尔基水利枢纽工程二期导截流施工[J].东北水利水电,2007,25(1):34-35.
作者姓名:李伟  赵艳梅  李剑峰  陈伟
作者单位:中国水利水电第一工程局,吉林,长春,130062
摘    要:尼尔基水利枢纽二期导流设计标准为5年重现期洪水,流量为534 m3/s.文章介绍截流技术参数和导截流施工方法.

关 键 词:导截流  二期导流  尼尔基水利枢纽
文章编号:1002-0624(2007)01-0034-02
修稿时间:2006-09-12

Second-stage river diversion and river closure construction in Nierji water complex
LI Wei,ZHAO Yan-mei,LI Jian-feng,CHEN Wei.Second-stage river diversion and river closure construction in Nierji water complex[J].Water Resources & Hydropower of Northeast China,2007,25(1):34-35.
Authors:LI Wei  ZHAO Yan-mei  LI Jian-feng  CHEN Wei
Abstract:The design criterion of second-stage river diversion in Nierji eater complex is 5 years return period flood, its discharge is 534 m3/s. The paper introduces the technique method of river diversion and the technique parameters of river closure.
Keywords:river diversion and river closure  second-stage river diversion  Nierji water complex