首页 | 本学科首页   官方微博 | 高级检索  
     

察尔森水库汛限水位过程线的确定
引用本文:李成林.察尔森水库汛限水位过程线的确定[J].东北水利水电,2003,21(1):43-45.
作者姓名:李成林
作者单位:松辽水利委员会 ,吉林 长春, 130021
摘    要:本文针对察尔森水库及其所处流域的实际情况,应用模糊水文学理论方法推求出水库汛限水位过程线,解决了水库在实际运行中难以实现分期抬高汛限水位期望值的关键问题,进一步增加了水库蓄水量和汛后蓄满的几率,更好地发挥了水库兴利效益。

关 键 词:汛限水位  过程线  察尔森水库
文章编号:1002-0624(2003)01-0043-02
修稿时间:2002年8月15日

Determination of flood control level hydrograph in Chaershen reservoir
LI Cheng-lin.Determination of flood control level hydrograph in Chaershen reservoir[J].Water Resources & Hydropower of Northeast China,2003,21(1):43-45.
Authors:LI Cheng-lin
Affiliation:LI Cheng-lin
Abstract:The flood control level hydrograph of Chaersheen reservoir is given by the fuzzy hydrology theory on the basis of the physical truth of the reservoi r and the catchments. The problem to run up the flood control level by stages is resolved, which is expectation in the practical operating. So the water storage of the reservoir and the probability to store water up after flood can increase . The reservoir benefit will be given play.
Keywords:flood control level  hydrograph  Chaersheen reservoir  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号