首页 | 本学科首页   官方微博 | 高级检索  
     

钱塘江河口考虑泥沙淤积的水资源可利用量研究
引用本文:尤爱菊,韩曾萃,徐有成,史英标.钱塘江河口考虑泥沙淤积的水资源可利用量研究[J].泥沙研究,2005(5):22-27.
作者姓名:尤爱菊  韩曾萃  徐有成  史英标
作者单位:1. 河海大学,江苏,南京,210098;浙江省水利河口研究院,浙江,杭州,310020
2. 浙江省水利河口研究院,浙江,杭州,310020
摘    要:探讨了用于分析河口冲淤与径流响应关系的三种方法:河相关系法、一维动床数值模拟和基于实测资料的多元回归分析方法。以钱塘江河口防洪允许的淤积增加量为限制条件,采用依据实测资料及动床数值模拟结果建立的多元回归模型,计算得到钱塘江河口的可利用水资源量不得超过闻家堰断面多年平均水资源量的20%。研究成果为钱塘江河口水资源开发利用提供了科学依据,计算方法和计算思路可供其它河口参考。

关 键 词:水资源  钱塘江河口  河相关系法  一维动床模型  多元回归模型
文章编号:0468-155X(2005)05-0022-06
收稿时间:2005-03-22
修稿时间:2005年3月22日

Allowable water resources development of Qiantang Estuary under considering sediment deposition
YOU Ai-ju,HAN Zeng-cui,XU You-cheng,SHI Ying-biao.Allowable water resources development of Qiantang Estuary under considering sediment deposition[J].Journal of Sediment Research,2005(5):22-27.
Authors:YOU Ai-ju  HAN Zeng-cui  XU You-cheng  SHI Ying-biao
Affiliation:1. Hohai University, Nanjing, 310098 ; 2. Zhejiang Institute of Hydraulics and Estuary, Hangzhou, 310020
Abstract:This paper compared three methods to analysis the influence of runoff change to estuarine fluvial process,including hydraulic geometry relation method,1D mobile-bed model and multivariate statistical analysis based on observed data. The multiple regression model based on observed data and 1D mobile-bed model was adopted to calculate the maximum development amount of water resources in Qiantang Estuary,and permissive deposition increment was determined as the limiting condition according to design scheme of the embankment along Qiantang estuary. Results show that as to Qiantang Estuary,the maximum development amount of water resources is no more than 20 percent of the total water resources. The speculation of this paper could be the reference to other estuaries.
Keywords:Qiantang Estuary  development of water resources  geometry relation method  1D mobile-bed model  multivariate statistical analysis
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号