首页 | 本学科首页   官方微博 | 高级检索  
     

两河口水电站心墙堆石坝防渗心墙料的研究
引用本文:欧阳学金.两河口水电站心墙堆石坝防渗心墙料的研究[J].中国农村水电及电气化,2014(8):67-70.
作者姓名:欧阳学金
作者单位:雅砻江流域水电开发有限公司,成都610051
摘    要:两河口水电站工程堆石坝坝高295m,砾石土心墙料429万m3。由于该工程堆石坝高达300m级,国内尚无建设的成功经验,而且防渗土料分布较广,料源复杂。本文通过对防渗心墙的研究,论证了其合理性和可靠性,为同类型大坝心墙料的研究提供参考。

关 键 词:心墙堆石坝  防渗心墙料  研究

Research of Core Wall Rock-fill Dam Anti-seepage Core Wall Materials in Lianghekou Hydropower Station
Affiliation:OUYANG Xue-jin ( Yalong River Basin Hydropower Development Co., Ltd., Chengdu 610051, China)
Abstract:Rock fill dam of Lianghekou Hydropower Station Project is as high as 295 m.Gravel soil core wall material of 4.29 million m3 is adopted.Since the rock fill dam in the project reaches 300m grade,there is no successful construction experience in China.Besides,impervious soil materials are widely distributed,and material sources are complex.The reasonability and reliability of the core wall are discussed through studying anti seepage core wall,thereby providing reference for studying similar dam cor wall materials.
Keywords:rock-fill dam  ant-seepage core wall material  study
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号