首页 | 本学科首页   官方微博 | 高级检索  
     

基于区间犹豫模糊语言集的水资源多目标决策
作者姓名:肖尧  钟平安  徐斌  马显斐  高益辉
作者单位:(1.河海大学水文水资源学院,南京210098;2.南京水利科学研究院水文水资源研究所,南京210029; 3.浙江省水利河口研究院水资源水环境研究所,杭州310020)
基金项目:国家重点研发计划(2017YFC0405604);国家自然科学基金(51609062);中央高校基本科研业务费专项(2018B10514);中国博士后特别资助项目(2018T110525)
摘    要:以鄂北水资源配置工程为对象,研究大型调水工程背景下的多水源多目标优化配置。将鄂北地区水库分为充蓄水库、补偿水库与在线水库等3类,根据各类水库特点对鄂北水资源配置工程进行系统概化,建立以年缺水量最小和调水成本最低为目标函数的多水源多目标优化配置模型。采用权重系数法进行求解得到非劣解集。最后采用基于区间犹豫模糊语言与TOPSIS的多目标决策方法对各方案的缺水量与调水量作出评价并遴选出最优方案。研究结果表明:对鄂北水资源配置工程而言,缺水量与调水量的权重比为7∶3的方案综合评价最优,重视缺水的同时兼顾调水成本;基于区间犹豫模糊语言集与TOPSIS的水资源多目标决策方法经本文实例验证具有较高的稳定性与可行性。

关 键 词:调水工程  优化配置  多目标  犹豫模糊语言  TOPSIS

Multir objective decisior-making of water resources based on interval hesitant fuzzy language set
Authors:XIAO Yao  ZHONG Pingan  XU Bing  MA Yufeil  GAO Yihu
Affiliation:(1. Collage of Hydrology and Water Resources, Hohai University, Nanjing 210098, China;2. Hydrology and Water Resources Department, Nanjing Hydraulic Research Institute, Nanjing 210029, China;3. Water Resources and Water Environment Department, Zhejiang Institute of Hydraulics & Estuary, Hangzhou 310020, China)
Abstract:Taking the water resources allocation project in the northern Hubei as the object, the multi-water source multi-objective optimal allo cation was studied under the background of a large-scale water transfer projet. The reservoirs in the northern Hubei are div ided into three types: filling reservoirs, compensation reservoirs, and online reservoirs. The water resources allocr tion project in the northern Hubei is systematically generalized according to the characteristics of various reservoirs.A multi-water source multi-objedive optimal allocation model is established with the minimum annual water shortage and the minimum water transfer cost as the objective function.The weight coefficient method is used to obtain the Pareto optimal set. The multi-objective decision-making method based on interval hesitant fuzzy language and TOPSIS is adopted to evaluate the water shortage and wat er transfer of each scheme and seled the optimal scheme. The results show that: for the water resources allocation project in the northern Hubei, the scheme with a weight ratio of water shortage to water transfer being 7:3 is the best in conrprehensive evaluation,which focuses on water shortage while the water transfer cost is taken into account; the multi-objective decision-making method of water resources based on interval hesitant fuzzy language set and TOPSIS has been proved to have high stability and feasibility by examples.
Keywords:water transfer project  optimal allocation  multi-objective  hesitant fuzzy language  TOPSIS
本文献已被 CNKI 等数据库收录!
点击此处可从《》浏览原始摘要信息
点击此处可从《》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号