基于PCA-PSO-SVR 的丹江口水库年径流预报研究 |
| |
作者姓名: | 张 岩 杨明祥 雷晓辉 舒 坚 牛文生 余 琅 |
| |
作者单位: | ( 1. 南昌航空大学 软件学院, 南昌 330063; 2. 中国水利水电科学研究院, 北京 100038; 3. 中航工业 西安航空计算技术研究所, 西安 710068) |
| |
基金项目: | 国家重点研发计划( 2016YFC0402201) ;国家自然科学基金( 51709271) ; 青年人才托举工程( 2017QNRC001) ; 中国水利水电科学 研究院基本科研业务费专项( WR0145B212017); 江西省研究生创新专项资金项目( YC2017068) |
| |
摘 要: | 在年径流预报中,气象因子之间的自相关会对预报精度产生影响。针对这个问题,将主成分分析(PCA)和粒子群优化(PSO)算法加入SVR模型中,建立了PCA-PSO-SVR预报模型,剔除冗余信息和噪声,提取因子间的主要特征,并选择模型的最优参数组合作为回归支持向量机(SVR)模型的输入。选择南水北调中线水源地丹江口水库为研究区,利用丹江口1981-2016年入库资料进行模型检验。结果表明,模型验证期间合格率为83.33%、距平一致率也达到83.33%,具有精度高稳定性强等优点,对丹江口水库年径流预报有一定的参考意义。
|
关 键 词: | 年径流预报 主成分分析 粒子群优化算法 回归支持向量机 丹江口水库 |
Research on annual runoff forecast of Danjiangkou Reservoir based on PCA-PSO-SVR |
| |
Authors: | ZHANG Yan YANG Mingxiang LEI Xiaohui SHU Jian NIU Wensheng YU Lang |
| |
Affiliation: | ( 1. School of Software, Nanchang Hangkong University , Nanchang 330063, China; 2. China Institute of Water Resources and Hydropower Research, Beij ing 100038, China; 3. A VIC Xican Institute of Aer onautical Computing Technology , Xican 710068, China) |
| |
Abstract: | In the annual runoff fo recast, the auto correlat ion betw een meteo ro log ical facto rs w ill have an impact o n fo recast accu2 r acy. In o rder to so lv e this problem, w e added PCA and PSO to the SVR model and established a PCA2PSO2SVR model. We re2 mo ved the r edundant informat ion and no ise, ext racted the main features of the facto rs, and used the o ptimal parameter combina2 tion of the model as input to t he reg ression support v ecto r machine ( SVR) model. T aking Danjiangko u Reserv oir, the w ater so ur ce of the Middle Route of the South2to2No rth Water Div ersion Project , as the study area, we carried o ut model t ests using the data from 1981 to 2016 in Danjiang ko u. T he results show ed that t he qualificat ion r ate during the model v erificat ion period was 831 33% and the consistency rat e also r eached 831 33% , indicating hig h accuracy and stability. The model has certain r efer2 ence v alue for the annua l runoff fo recast of Danjiang ko u Reser vo ir. |
| |
Keywords: | annual runoff fo recast principal component analy sis part icle sw arm optimization r eg r essio n support vecto r machine Danjiangkou Reserv oir |
本文献已被 CNKI 等数据库收录! |
| 点击此处可从《》浏览原始摘要信息 |
|
点击此处可从《》下载全文 |
|