首页 | 本学科首页   官方微博 | 高级检索  
     

大化水电站扩建工程上游翼墙设计及工程处理
引用本文:杨海林.大化水电站扩建工程上游翼墙设计及工程处理[J].红水河,2012,31(3):1-5.
作者姓名:杨海林
作者单位:广西电力工业勘察设计研究院,广西 南宁,530023
摘    要:根据大化水电站扩建工程枢纽布置的需要,引水渠右侧、接头土石坝坡脚处设置了一段圆弧型翼墙,因基础地质较差,采取了一系列工程处理措施,经过两年多时间的运行,证明上游翼墙设计合理、工程处理合适。

关 键 词:翼墙  基础处理  大化水电站扩建工程

Design and Engineering Treatment for Upper Wing Wall for Extension Project of Dahua Hydropower Station
YANG Hai-lin.Design and Engineering Treatment for Upper Wing Wall for Extension Project of Dahua Hydropower Station[J].Hongshui River,2012,31(3):1-5.
Authors:YANG Hai-lin
Affiliation:YANG Hai-lin(Guangxi Electric Power Industry Investigation Design and Research Institute,Nanning,530023)
Abstract:Based on the layout requirement of Dahua hydropower station extension project,an arc wing wall is set at the slope toe of joint earth-rock dam on the right side of diversion channel.A series of engineering treatment measures are required due to poor fundamental geology.It is proved that the upstream wing wall is reasonable in design and suitable in engineering treatment throughout practical running more than two years.
Keywords:wing wall  foundation treatment  extension project of Dahua hydropower station