后张法预应力箱梁预应力孔道堵塞原因分析
引用本文:康国芳.后张法预应力箱梁预应力孔道堵塞原因分析[J].水科学与工程技术,2011(2):78-79.
作者姓名:康国芳
作者单位:中铁十六局集团路桥工程有限公司,北京密云,101500
摘    要:预应力孔道通顺对施加设计预应力,保证箱梁灌造速度起着重要作用.从抽拔橡胶管材质及安装、孔道位置线型、端模安装、钢筋绑扎、混凝土振捣、拔管时间等多方面探讨了预应力孔道堵塞的原因,并提出了相应的处理措施,以期为实际施工提供指导.

关 键 词:预应力孔道  抽拔橡胶管  孔道堵塞

Post-tensioned Prestressed Box Girder Duct Blockage Analysis
KANG Guo-fang.Post-tensioned Prestressed Box Girder Duct Blockage Analysis[J].Water Sciences and Engineering Technology,2011(2):78-79.
Authors:KANG Guo-fang
Affiliation:KANG Guo-fang(China Railway 16 Bureau Group Road & Bridge Engineering Co.,Ltd.,Miyun 101500,China)
Abstract:Duct fluent on the design of prestressed imposed to ensure the speed box made plays an important role.This paper from the rubber tube materials and installation of linear pore location,end-model installation,steel colligation,concrete shake,extubation time and other aspects discussed the duct blockage causes and appropriate treatment measures proposed to provide guidance for the actual construction.
Keywords:prestressed duct  pulling the rubber tube  duct blockage