青狮潭电厂扩建中引水钢管与放空隧洞接头段设计
引用本文:温伟萍.青狮潭电厂扩建中引水钢管与放空隧洞接头段设计[J].广西水利水电,1999(2):22-23.
作者姓名:温伟萍
作者单位:广西右江水利开发有限责任公司,南宁,530026
摘    要:通过对接头段施工条件、方法进行技术经济比较,得出利用输水放空隧洞堵水闸门预埋件与止水钢板完成引水钢管与隧洞的连接,作用力通过支撑桁架传至镇墩方案,施工难度小,停水时间短,损失少。

关 键 词:接头连接  闸门埋件  止水钢板  支撑桁架
修稿时间:1998-12-15)

The design of joint segment between emptying tunel and steel high-line conduit in extension of the Qingshitan hydropower plant
Wen Weiping.The design of joint segment between emptying tunel and steel high-line conduit in extension of the Qingshitan hydropower plant[J].Gx Water Resources & Hydropower Engineering,1999(2):22-23.
Authors:Wen Weiping
Abstract:Through technical economy comparison , the author thinks that the introduced design plan includes merits such as the less construction difficulty , the shorter flow stopping time , and the less loss .
Keywords:joint connecting  sluice embedded parts  bracing truss