首页 | 本学科首页   官方微博 | 高级检索  
     

基于PCSWMM模型的城市内涝风险评估
引用本文:吴海春,黄国如.基于PCSWMM模型的城市内涝风险评估[J].水资源保护,2016,32(5):11-16.
作者姓名:吴海春  黄国如
作者单位:;1.华南理工大学土木与交通学院;2.华南理工大学亚热带建筑科学国家重点实验室
基金项目:水利部公益性行业科研专项(201301093, 201401048);广东省科技计划项目(2016A020223003);华南理工大学亚热带建筑科学国家重点实验室自主研究课题项目(2014ZC09);广州市水务科技项目(GZSW-201401)
摘    要:构建了基于PCSWMM的海甸岛城市雨洪模型,采用3场次实测暴雨(20081013,20101005和20111005)内涝淹没资料对模型进行验证,结果表明所构建模型具有良好的精度和可靠性。以1 a、2 a、5 a、10 a和20 a 5种设计重现期降雨组合同频率设计潮位进行模拟计算,对海甸岛现状排水能力进行评估,结果表明,海甸岛84.8%管网排水能力低于1年一遇。以5 a、10 a、20 a、50 a降雨组合对应潮位对海甸岛进行内涝风险评估,得到了海甸岛4种不同重现期暴雨的内涝风险等级划分状况。

关 键 词:PCSWMM模型  管网排水能力  内涝风险评估  海甸岛
收稿时间:2016/6/22 0:00:00

Risk assessment of urban waterlogging based on PCSWMM model
WU Haichun and HUANG Guoru.Risk assessment of urban waterlogging based on PCSWMM model[J].Water Resources Protection,2016,32(5):11-16.
Authors:WU Haichun and HUANG Guoru
Affiliation:School of Civil Engineering and Transportation, South China University of Technology, Guangzhou 510640, China and School of Civil Engineering and Transportation, South China University of Technology, Guangzhou 510640, China; State Key Laboratory of Subtropical Building Science, South China University of Technology, Guangzhou 510640, China
Abstract:An urban rainstorm model based on PCSWMM for Haidian Island in Haikou City was developed. The model was verified by three measured rainfalls events and the corresponding tidal graph records in 20081013, 20101005, and 20111005. The simulated waterlogging submerged positions and depths are basically consistent with the actual investigation situation, which shows that the model has high precision and reliability. It respectively evaluated the present situation of drainage networks and the waterlogging risks in Haidian Island in Haikou City by using design rainstorms of return periods of 1, 2, 5, 10, 20, and 50 years with the corresponding tidal levels. The result shows that the present situation of 84. 8% of the drainage networks in Haidian Island in Haikou City is less than 1-year design return period. Meanwhile, the waterlogging risk assessment of design rainstorms with 5, 10, 20, 50-year return periods and three measured rainstorms with the corresponding tidal levels are analyzed.
Keywords:PCSWMM model  water discharge capacity of drainage networks  waterlogging risk assessment  Haidian Island
本文献已被 CNKI 等数据库收录!
点击此处可从《水资源保护》浏览原始摘要信息
点击此处可从《水资源保护》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号