二滩水电站地下厂房系统洞室围岩变形及支护处理措施
引用本文:李正刚.二滩水电站地下厂房系统洞室围岩变形及支护处理措施[J].四川水力发电,1999,18(2):24.
作者姓名:李正刚
作者单位:四川攀枝花二滩工程公司
摘    要:二滩水电站地下厂房系统洞室群规模巨大,其跨度、高度均位居世界前列。由于场区地应力比较高,在开挖期间出现了局部围岩的大变形及岩爆、喷混凝土层剥落等不良现象。对围岩采用系统喷锚支护,局部作加强处理,稳定性良好。工程利用岩体质量Q值确定围岩支护压力,为在设计支护强度方面提供了实例。

关 键 词:二滩水电站  地下厂房  高地应力  围岩变形  喷锚支护  支护强度
修稿时间::1997-12-1

Deformation and Supporting of Surrounding Rock in Caverns of Underground Powerhouse complex at Ertan Hydropower Station
Li Zhenggang.Deformation and Supporting of Surrounding Rock in Caverns of Underground Powerhouse complex at Ertan Hydropower Station[J].Sichuan Water Power,1999,18(2):24.
Authors:Li Zhenggang
Abstract:Caverns in underground powerhouse complex at Ertan is of a massive scale with the longest span and length in the world.Due to high in situ stress in the powerhouse area,important deformation of local surrounding rock,rock burst,shotcrete spalling occur during excavation.Systematic rock bolt support and shotcrete were carried out for the surrounding rock and reinforcement was done locally for rock stability.Supporting force for surrounding rock is determined by Q value of rock quality.It is an example for design of supporting strength.
Keywords:Ertan hydropower station  underground powerhouse  high in situ stress  deformation of surrounding rock  rock bolt support and shotcrete  support strength  