大渡河流域混联水库群长期优化调度
引用本文:胡挺,唐海华,梅亚东,黄春雷,郑慧涛.大渡河流域混联水库群长期优化调度[J].水电自动化与大坝监测,2011,35(6):59-63.
作者姓名:胡挺  唐海华  梅亚东  黄春雷  郑慧涛
作者单位:1. 武汉大学水资源与水电工程科学国家重点实验室,湖北省武汉市,430072
2. 国网电力科学研究院/南京南瑞集团公司,江苏省南京市,210003
基金项目:国家电网科学技术项目《长江上游巨型水电站群联合调度研究》
摘    要:以大渡河混联水电站水库群为研究对象,建立了兼顾不同保证出力情形下以发电量最大为目标的长期优化调度模型,并采用逐步优化算法(POA)及基于变域变步长搜索的POA改进算法求解。结果表明:在总发电量增加前提下,改进算法计算耗时较传统POA缩短约90倍;不同保证出力情形下,梯级、整体考虑惩罚较单库惩罚考虑,其流域多年平均发电量分别增加了241GW.h和309GW.h。

关 键 词:混联水电站水库群  长期优化调度  逐步优化算法  改进算法  保证出力

A Study on Long-term Optimal Dispatch for Parallel-serial Reservoirs of Dadu River
HU Ting,TANG Haihua,MEI Yadong,HUANG Chunlei,ZHENG Huitao.A Study on Long-term Optimal Dispatch for Parallel-serial Reservoirs of Dadu River[J].HYDROPOWER AUTOMATION AND DAM MONITORING,2011,35(6):59-63.
Authors:HU Ting  TANG Haihua  MEI Yadong  HUANG Chunlei  ZHENG Huitao
Affiliation:1(1.State Key Laboratory of Water Resources & Hydropower Engineering Science,Wuhan University,Wuhan 430072,China;2.State Grid Electric Power Research Institute,Nanjing 210003,China)
Abstract:Aiming at the parallel-serial hydropower stations and reservoirs of Dadu river as research object,a long-term optimal dispatch model with target of maximum power output in different situations of firm power is established.The POA and an improved algorithm of POA based on search with variable area and step size are used to solve the model.The results show that the time consumption of improved algorithm is 90 times shortens than that of traditional POA under the precondition of total power output increase.In addition,under the different firm power situations,the average annual power output of cascade and whole power output increase 241 and 309 GW·h respectively than that of single reservoir.
Keywords:parallel-serial hydropower stations and reservoirs  long-term optimal dispatch  progressive optimality algorithm  improved algorithm  firm power