首页 | 本学科首页   官方微博 | 高级检索  
     

广州市东濠涌流域低影响开发措施雨洪控制效应评估
引用本文:张明珠,麦叶鹏,孟庆强,李 丹,刘 浩,黄国如.广州市东濠涌流域低影响开发措施雨洪控制效应评估[J].水资源与水工程学报,2017,28(4):28-34.
作者姓名:张明珠  麦叶鹏  孟庆强  李 丹  刘 浩  黄国如
作者单位:1.广州市水务科学研究所, 广东 广州 510220; 2.华南理工大学 土木与交通学院, 广东 广州 510640;3.华南理工大学 亚热带建筑科学国家重点实验室, 广东 广州 510640
基金项目:广州市水务科技项目(GZSW-201401); 广东省水利科技创新项目(2016-32); 广州市科技计划项目(201707020020); 广东省科技计划项目(2016A020223003)
摘    要:随着我国城市化进程的快速推进和海绵城市理念的不断加深,低影响开发(LID)措施日益受到各地重视。为评估LID措施的雨洪控制效果,构建基于SWMM的东濠涌流域城市雨洪模型,分析选取适合该研究区域的LID措施,分别采用重现期为0.5、1、2、5、10年的设计降雨对LID措施的雨洪控制效应进行分析。研究结果表明:LID措施能够较为有效地减小流域洪峰流量、径流量及推迟峰值时间,对初期雨水径流污染负荷也具有较好的削减作用,且径流量和污染物削减率均随着重现期增大而减小。

关 键 词:低影响开发  SWMM模型  降雨径流  污染物负荷  雨洪控制  效应评估  东濠涌流域

Assessment of flood control effect under low impact development in East Ho Chong Watershed, Guangzhou City
ZHANG Mingzhu,MAI Yepeng,MENG Qingqiang,LI Dan,LIU Hao,HUANG Guoru.Assessment of flood control effect under low impact development in East Ho Chong Watershed, Guangzhou City[J].Journal of water resources and water engineering,2017,28(4):28-34.
Authors:ZHANG Mingzhu  MAI Yepeng  MENG Qingqiang  LI Dan  LIU Hao  HUANG Guoru
Abstract:With the rapid progress of urbanization in China and the deepening of the concept of Sponge City, Low Impact Development (LID) measures have attracted more and more attention all over the country. In order to evaluate the effect of flood control on LID measures, the urban flood model of East Ho Chong watershed is constructed based on SWMM model. Then the suitable LID measures are selected for the study area, and the flood control effect of the LID measures is analyzed by using the design rainfall with the return period of 0.5, 1, 2, 5, and 10 years. The results showed that LID measures can effectively reduce the peak flow, runoff and delay the peak time. They also had good effect on reducing pollutant loads of first flush runoff, and the runoff and pollutant reduction rate decreased with the increase of the return period.
Keywords:low impact development    SWMM model    rainfall runoff    pollutant loads  flood control  effect assessment  East Ho Chong Watershed
本文献已被 CNKI 等数据库收录!
点击此处可从《水资源与水工程学报》浏览原始摘要信息
点击此处可从《水资源与水工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号