首页 | 本学科首页   官方微博 | 高级检索  
     

南水北调中线干渠冰期输水能力研究
引用本文:穆祥鹏,陈文学,崔巍,郭晓晨,王琦.南水北调中线干渠冰期输水能力研究[J].南水北调与水利科技,2009,7(6):118-122.
作者姓名:穆祥鹏  陈文学  崔巍  郭晓晨  王琦
作者单位:中国水利水电科学研究院,北京,100038
基金项目:"十一五"国家科技支撑计划重大项目 
摘    要:冰盖的形成使得渠道的湿周增加,水力半径减小,输水阻力加大,致使渠道过流能力减小,影响渠道的冬季输水。渠道冰期的输水能力无论对工程设计,还是运行管理都是十分重要的。文章分析了结冰期冰盖的安全推进模式和稳定封冻期渠道水位壅高的影响,提出了确定渠道在结冰期和稳定封冻期的输水能力的控制指标,在此基础上,对南水北调中线黄河以北渠段结冰期以及完全封冻后的输水能力进行了研究,确定了南水北调中线黄河以北干渠的冬季输水能力,研究成果对于南水北调中线干渠的冬季管理和运行具有一定的参考价值。

关 键 词:冰期输水  输水能力  冰盖糙率  南水北调中线工程

Study on Water Diversion Capacity in the Middle Route of the South-to-North Water Transfer Project in Ice Period
MU Xiang-peng,CHEN Wen-xue,CUI Wei,GUO Xiao-chen,WANG Qi.Study on Water Diversion Capacity in the Middle Route of the South-to-North Water Transfer Project in Ice Period[J].South-to-North Water Transfers and Water Science & Technology,2009,7(6):118-122.
Authors:MU Xiang-peng  CHEN Wen-xue  CUI Wei  GUO Xiao-chen  WANG Qi
Abstract:The ice cover in canal can increase wetted perimeter, reduce hydraulic radius and increase hydraulic resistance, which can diminish the water diversion capacity of canal. The water diversion capacity of canal in winter is very important to design and management. In this paper, the factors to determine the water diversion capacity of canal are put forward, based on rising of water level and progress of ice cover. Through the calculation of steady nonuniform flow with composite roughness coefficient, water diversion capacity during freeze-up period and ice-covered period is researched and water diversion capacity is put forward for part of the Middle Route of South-to-North Water Transfer Project in north of Yellow River in winter. The results are important for water diversion of the Middle Route of South-to-North Water Transfer Project in ice regime.
Keywords:water diversion during winter  water diversion capacity  ice cover roughness  the Middle Route of South-to-North Water Transfer Project
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号