首页 | 本学科首页   官方微博 | 高级检索  
     

水利水电工程施工土石方调配方法及其应用
引用本文:宋凤莲,刘全,邬志.水利水电工程施工土石方调配方法及其应用[J].南水北调与水利科技,2012,10(1):145-149.
作者姓名:宋凤莲  刘全  邬志
作者单位:1. 武汉大学,动力与机械学院,武汉430072
2. 武汉大学,水利水电学院,武汉430072
3. 中国水电工程顾问集团公司华东勘测设计研究院,杭州,310014
摘    要:水利水电工程施工土石方调配受其空间、时间和数量的限制,是影响工程成本的重要因素之一。通过分析工程土石方在开挖、转运、加工、利用等过程中的施工进度与其类型和数量平衡的关系以及开挖、填筑与空间关系的协调性,建立了土石方调配初始条件和边界条件表达方式,建立了小时段、大数量、高精度的动态调配仿真模型,提出土石方的生产、加工、利用、系统调度及其相关关系的数学模型,实现了水电工程土石方施工的调配及其动态控制。结合工程实例的应用分析,验证了模型的可靠性与实用性。可广泛应用于水利水电工程的土石方调配方案制定与施工现场管理中,具有较重要的理论意义和工程实践价值。

关 键 词:土石方施工  系统分析  土石方调配  施工管理

Method and Its Application of Earth-rock Allocation for Water Conservancy and Hydropower Construction Proiect
SONG Feng-lian , LIU Quan , WU Zhi.Method and Its Application of Earth-rock Allocation for Water Conservancy and Hydropower Construction Proiect[J].South-to-North Water Transfers and Water Science & Technology,2012,10(1):145-149.
Authors:SONG Feng-lian  LIU Quan  WU Zhi
Affiliation:1.Wuhan University a.College of Power and Mechanical Engineering; b.College of Water Resources and Hydropower Engineering,Wuhan 430072,China; 2.Hydrochina Huadong Engineering Corporation,Hangzhou 310014,China)
Abstract:The earth-rock allocation is limited by the space,time and quantity of the water conservancy and hydropower construction projects,and it is one of the important factors affecting the project cost.Based on the analysis of the relationship between the construction progress during the periods of the excavation,transport,processing,and effective utilization of the earth-rock and the type and quantity of the earth-rock,and the coordination among the excavation,filling,and spatial distribution of the earth-rock,the initial and boundary conditions for the earth-rock allocation model are proposed.Then,a dynamic allocation simulation model is developed with small time-period,large quantity,and high precision,and a mathematical model is established to simulate the production,processing,utilization,systematic scheduling of the earth-rock,which can realize the allocation and dynamic control of the earth-rock for the water conservancy and hydropower construction projects.These models are applied to a practical engineering project,which shows that the models are reliable and practicable.Consequently,the method can be used widely in the establishment of the earth-rock allocation plan and in the construction site management for the water conservancy and hydropower construction projects,and it has a significant theoretical and practical value.
Keywords:earth-rock construction  systematic analysis  earth-rock allocation  construction management
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号